Laserfiche WebLink
CHARMER WAY <br /> Drainage Ditch <br /> �Asphalt---\--7 <br /> Soil KEY <br /> A Mw1 Stockpile <br /> � = Soil Boring Location <br /> Soil � + <br /> + Barbed = 30° Angle Boring <br /> Stockpile i Wire location <br /> Fence <br /> • = Location of sample <br /> EX11-44 <br /> Vacant f'�^ <br /> / r Excavation B' Building += 36' deep excavation <br /> EX 1-44 ®= 44' deep excavation <br /> Concrete <br /> = Ground water <br /> 1 + { monitoring well <br /> locations <br /> Shed _ _ = Estimated extent of <br /> �Portcble soil contamination <br /> '� Pea Grovel B2 Fence \ <br /> 9Stockpile B3 / \ NOTES <br /> O� MW2 A' / <br /> y Z' 1 Site plan adapted from <br /> Asp <br /> 'p As halt / Well plan provided by SEMCO <br /> Soil <br /> / Stockpile <br /> MW3 <br /> Gate & i <br /> Drainage Ditch <br /> LEARNED AVENUE 0 10 20 sa 40 <br /> Serle iu Feet <br /> SITE PLAN WKA NO 2307 02 <br /> DRAWN BY HLA <br /> 1444 MARIPOSA ROAD DATE 12/93 <br /> WALLACE • XMIL. & ASSOCIATES, INC CHECKED BY KMB EXHIBIT 2 <br /> 0110TECHNICAL ENGINEERING Stockton, California <br /> GEOLOGIC & RHVIR0NMHNTAL SERVICES <br />