My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2004
>
3500 - Local Oversight Program
>
PR0545521
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2020 2:18:48 AM
Creation date
3/12/2020 11:37:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545521
PE
3528
FACILITY_ID
FA0005103
FACILITY_NAME
AFFORDABLE FENCE COMPANY
STREET_NUMBER
2004
Direction
E
STREET_NAME
MARIPOSA
STREET_TYPE
RD
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
2004 E MARIPOSA RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Volume of: Open Borehole and Annular Space <br /> Between Casing and Hole <br /> Volume/ Volume/. <br /> Hole linear. ft. Nominal linear ft. of* <br /> Diameter of hole Casing Diameter Annular Space <br /> (inches) Gal. ' Cu. ft. (inches) Gal. Cu. Ft. <br /> 7.25 2.14 0.29 2 1.91 0.26 i <br /> 8.25 2.78 0.37 2 2.55 0.34 <br /> I <br /> 10.25 4.29 0.57 2 4.06 0.54 <br /> 10.25 4.29 0.57 4 3.46 0.46 <br /> 12.25 6. 13 . 0.82 4 5.30 0.71 <br /> I <br /> *Note: Annular volumes will be multiplied by 301 to account for <br /> porosity of filter pack. <br /> i <br /> If the aquifer is slow to recharge, development will <br /> continue until: recharge is too slow to practically continue. <br /> The volume of water produced versus time will be recorded. <br /> All withdrawn; groundwater will be stored on-site in 55 <br /> gallon waste drums unless permission. is granted by the <br /> appropriate regulatory agency to discharge the water to the <br /> ground surface or sanitary sewer. Drummed water will be <br /> labeled with ., the source of the water to help ensure <br /> appropriate disposal based on contamination levels. <br /> 11.0 Soil Sampling 'Protocol <br /> 11.1 Sample Collection During Drilling Activities <br /> A proposal will .. be submitted to the leadt Regulatory .. . . . . <br /> Authority with proposed boring/sampling locations. The <br /> exact location;, and number of borings at each site will be <br /> determined in the field by the Project Geologist/Engineer. <br /> Prior to arriving at the sample site, the drill rig/augers <br /> will be steam cleaned and all sampler equipment will be <br /> cleaned. Cleaning will be conducted on-site on all sampling <br /> equipment between each sample interval. <br /> Soil samples will be obtained using a California modified <br /> split-spoon sampler containing three, six inch long, two <br /> inch diameter brass tubes. The sampler will be driven 18 <br /> inches ahead of the hollow stem auger by a 140 pound hammer <br /> with a 30 inch drop in accordance with American Society for <br /> I <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.