My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2431
>
3500 - Local Oversight Program
>
PR0545532
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2020 2:07:01 AM
Creation date
3/12/2020 11:42:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545532
PE
3528
FACILITY_ID
FA0022329
FACILITY_NAME
BLINCO TRUCKING
STREET_NUMBER
2431
Direction
E
STREET_NAME
MARIPOSA
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
17130003
CURRENT_STATUS
02
SITE_LOCATION
2431 E MARIPOSA RD
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C lip - — <br /> VAT C <br /> A S S O C i A T E S I N C <br /> who informed ATC that rinsing of the tank would not be required as long as Lower Explosive <br /> Level (LEL), atmosphere and the oxygen levels within the tank were within acceptable parameters <br /> as it relates.to fire safety. <br /> An updated Underground Storage Tank Closure Permit f4pplication has been completed in <br /> triplicate, and is included in Attachment 2. <br /> Closure In-Place <br /> Pending PHS/EHD approval, the tank will be inerted with by inserting approximately 70 pounds <br /> of dry ice through the fill port of the tank. A combustible/flammableas detector tector will be utilized <br /> to assess the LEL atmosphere and oxygen Ievels within the tank. <br /> The tank will then be filled with "Class B" cement slurry (two sacks of cement pei cubic yard of <br /> sand). The cement will be commercially mixed and pumped under pressure into the tank. Due <br /> to the presence of a reinforced concrete slab overlaying the tank and piping, ATC proposes to <br /> abandon piping below grade by forcing concrete or grout through the piping and capping the <br /> pipes just below grade. <br /> Tank Abandonment Report <br /> After completion of all abandonment activities, a final letter will be submitted to the Fire <br /> District, PHS/EHD and the Regional Water Quality Control Board. <br /> WA94304Veports\UST closure.doc 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.