Laserfiche WebLink
' RESNA Industries Inc <br /> Quality Assurance/Quality Control Plan <br /> Revised November 1992 <br /> To reduce the potential for cross contamination between wells, the monitorings will take place <br /> ' in order from the least to most contaminated, if known Wells containing free product will be <br /> monitored last. Between each well monitoring the equipment will be decontaminated. <br /> Water level data collected from the wells will be used to develop a groundwater contour map <br /> ' for the project site Groundwater flow will be estimated to be perpendicular to equipotential <br /> lines drawn on the map <br /> 1 <br /> 10.0 WELL DEVELOPMENT PROTOCOL <br /> Groundwater monitoring wells will be surged and developed prior to setting the surface seal <br /> ' Approximately 10 times the volume of water in the casing will be withdrawn if possible Casing <br /> volumes will be calculated in the following manner <br /> VOLUME OF SCHEDULE 40 PVC PIPE <br /> Diameter (inches) I D (inches) Volume <br /> Gal/linear feet <br /> 2 2067 017 <br /> ' 4 4 026 066 <br /> ' VOLUME OF OPEN BOREHOLE AND ANNULAR SPACE BETWEEN CASING AND HOLE <br /> Hole Volume/Linear Feet of Hole Nominal Volume/Linear Feet of <br /> Annular Space' <br /> Diameter Casing <br /> ' <br /> (inches) Diameter <br /> Gallons Cubic Feet (inches) Lallans Cubic Feet <br /> ' <br /> 725 214 029 2 1 91 026 <br /> 825 278 037 2 2 55 034 <br /> 1025 429 057 2 406 054 <br /> ' 1025 429 057 4 346 046 <br /> 1225 613 082 4 530 071 <br /> Annular volumes will be multiplied by 30% to account for porosity of filter pack <br /> QAQC1092 FNL 8 <br />