Laserfiche WebLink
tRPSNA Industnes Inc <br /> Quality Assurance/Quality Control Plan <br /> Revised November 1992 <br /> ' 11.3 Sampling from Soil Piles or Shallow Soil Pits <br /> Soil samples will be collected and transported from excavated material in the manner <br /> described in the previous section, however, a backhoe will not be utilized If composite <br /> samples are collected, four brass cylinders will be collected for every 50 cubic yards of <br /> matenal to be sampled unless otherwise specified by the lead regulatory agency. The <br /> samples will be composited by the state certified laboratory personnel prior to testing. <br /> 12.0 GROUNDWATER SAMPLING PROTOCOL <br /> Prior to arriving at the sampling site, all sampling equipment will be washed with laboratory <br /> grade detergent, and rinsed twice with tap water, once with acetone, and once with delonized <br /> ' water this procedure will be carred out on-site before sampling of other monitoring wells, if <br /> more than one well is to be sampled with the sample sampling device <br /> i <br /> Immediately prior to sampling, the depth to water (I)TW) in the well will be recorded. The <br /> ' thickness of product on top of the groundwater, if present, will be measured using an interface <br /> probe The procedure for monitoring is presented in Section 9 0 (Groundwater Monitoring <br /> ' Protocol) <br /> ' If free product is detected, analysis of groundwater at the interface for dissolved product will <br /> not be conducted A product sample will be collected for source identification If all free <br /> ' product cannot be removed, an interval specific sampling device may be utilized to collect a <br /> sample from below the zone of free product. Before collecting groundwater samples from each <br /> well, the well will be purged until indicator parameters (temperature, conductivity, and pH) <br /> ' stabilize This will entail the removal of at least four well casing volumes by bailing or <br /> pumping The criteria for determining well casing volumes and temporary storage of purged <br /> 1 water is outlined in Section 10 0 (Well Development Protocol) The indicator parameter <br /> QAQCIM FNt. 12 <br />