My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005270
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2431
>
3500 - Local Oversight Program
>
PR0545532
>
ARCHIVED REPORTS_XR0005270
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2020 2:01:42 AM
Creation date
3/12/2020 11:46:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005270
RECORD_ID
PR0545532
PE
3528
FACILITY_ID
FA0022329
FACILITY_NAME
BLINCO TRUCKING
STREET_NUMBER
2431
Direction
E
STREET_NAME
MARIPOSA
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
17130003
CURRENT_STATUS
02
SITE_LOCATION
2431 E MARIPOSA RD
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
tRPSNA Industnes Inc <br /> Quality Assurance/Quality Control Plan <br /> Revised November 1992 <br /> ' 11.3 Sampling from Soil Piles or Shallow Soil Pits <br /> Soil samples will be collected and transported from excavated material in the manner <br /> described in the previous section, however, a backhoe will not be utilized If composite <br /> samples are collected, four brass cylinders will be collected for every 50 cubic yards of <br /> matenal to be sampled unless otherwise specified by the lead regulatory agency. The <br /> samples will be composited by the state certified laboratory personnel prior to testing. <br /> 12.0 GROUNDWATER SAMPLING PROTOCOL <br /> Prior to arriving at the sampling site, all sampling equipment will be washed with laboratory <br /> grade detergent, and rinsed twice with tap water, once with acetone, and once with delonized <br /> ' water this procedure will be carred out on-site before sampling of other monitoring wells, if <br /> more than one well is to be sampled with the sample sampling device <br /> i <br /> Immediately prior to sampling, the depth to water (I)TW) in the well will be recorded. The <br /> ' thickness of product on top of the groundwater, if present, will be measured using an interface <br /> probe The procedure for monitoring is presented in Section 9 0 (Groundwater Monitoring <br /> ' Protocol) <br /> ' If free product is detected, analysis of groundwater at the interface for dissolved product will <br /> not be conducted A product sample will be collected for source identification If all free <br /> ' product cannot be removed, an interval specific sampling device may be utilized to collect a <br /> sample from below the zone of free product. Before collecting groundwater samples from each <br /> well, the well will be purged until indicator parameters (temperature, conductivity, and pH) <br /> ' stabilize This will entail the removal of at least four well casing volumes by bailing or <br /> pumping The criteria for determining well casing volumes and temporary storage of purged <br /> 1 water is outlined in Section 10 0 (Well Development Protocol) The indicator parameter <br /> QAQCIM FNt. 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.