Laserfiche WebLink
RESNA <br /> SITE SAFETY PLAN <br /> FACILITY BACKGROUND <br /> ' B <br /> JJ Company operates a truck terminal facility at the site. Petroleum hydrocarbon <br /> contamination was detected beneath the old tank (3,500 gallon gasoline) at the site. <br /> Previous investigations have included installation of one monitoring well and five soil <br /> borings. <br /> WORK PLAN <br /> Task One: Drill one boring to approximately 87 feet below grade and complete as a <br /> monitoring well. <br /> Task Two: Collect two soil samples from the boring for BTEX and TPHg analysis. <br /> ' Task Three: Monitor, survey, develop and sample the new well and purge and sample the <br /> facility well for BTEX and TPHg. <br /> Task Four: Survey, monitor and sample the facility well. <br /> 1 <br /> PAGE 2 <br />