Laserfiche WebLink
1 <br /> RESNA <br /> 3 <br /> SITE SAFETY PLAN <br /> ' On-site communications ❑ Radio ® Verbal ❑ Hand Signals <br /> ❑ Other <br /> Designate hand signals here <br /> ' Off-site communications ❑ Radio ® Telephone <br /> 0 Other <br /> The specific signal for an emergency is Verbally Given <br /> The specific signal for an evacuation is Verbally Gwen <br /> Evacuation assembly point is To be determined on-site prior to beginning work activities <br /> ' MARK EVACUATION ROUTE(S) ON SITE MAP ❑ CHECK WHEN DONE <br /> SANITATION AND DECONTAMINATION <br /> Personnel Decontamination Procedure All contaminated Personal protective equipment (i e f <br /> gloves, coveralls) will be placed on and covered with 6- <br /> mil plastic sheeting,along with the drill cuttings <br /> ' Location of Wash Wafer Inside Maintenance Building <br /> Location of Toilet Inside Maintenance Building <br /> Location of Drinking Water Inside Maintenance Building <br /> MARK LOCATION OF EYEWASH AND SHOWER DRENCH ON SITE MAP ❑CHECK WHENDONE <br /> ' Equipment Decontamination Procedure Equipment will be washed with a trisodium <br /> phosphate solution and/or steamcleaned <br /> ' Materials to be Disposed of as Hazardous Waste All sal and water produced will be stored on- <br /> site until appropriate disposal methods are <br /> ' determined <br /> PAGE 8 <br />