22 East Market <br /> Moorman's Water Systems Invoice Accounting <br /> December 18, 1992 <br /> Permit # 92-3965 issued for the destruction of the emergency domestic <br /> well. <br /> January 13, 1993 <br /> Phone call from Moorman's to schedule the destruction. Appointment made <br /> between 9:00 and 10:00 QrA <br /> January 14, 1993 (site inspection 2.0 hr) <br /> Site visit. No-one on site at 9:55ApA Left site at 10:00ay - <br /> Phone call to Moorman's. Crew on the way. Scheduled inspection between <br /> 11:00 and 11:30gv✓x Allowing for set-up time. <br /> Site visit. Arrived on-site at approximately 11:15 and set-up still in <br /> progress at 12:15 Crew lunch time scheduled. <br /> Site visit. Arrived on-site at approximately 12:45Frn Crew still having <br /> trouble with set-up. Wench connection and fork-lift back end lifting. <br /> Requested phone call when set-up complete. Left site at 1:15F rn <br /> Prepared inspection report. <br /> January 15, 1993 (phone .4 hours -and site consultation .7 hours) <br /> Phone call to Moorman's regarding scheduling of perforation inspection. <br /> I was informed that the perforation has occurred yesterday. I informe <br /> Moorman's that I had not received notification. Moorman's representedl Je- <br /> informed me that he was sorry but he had not been informed by the on-site <br /> crew that additional notification was requested. Discussed further <br /> scheduling. No schedules were confirmed. <br /> Discussed Moorman's perforation without inspection-and the equipment which <br /> was on-site with PHS/EHD staff. <br /> Phone call to the City of Stockton regarding perforation without <br /> inspection. Left message. <br /> Phone call from the City of Stockton. Discussed perforation and equipment <br /> available. A site meeting was tentatively scheduled later that afternoon <br /> with the City of Stockton, Moorman's and PHS/EHD to discuss possible re- <br /> perforation under PHS/EHD inspection. <br /> Numerous phone calls from Moorman's to discuss PHS/EHD possible request to <br /> re-perforate. <br /> Site visit. Arrived on-site at approximately 3:30 ftvx Discussed equipment <br /> available and communications. Re-perforation under PHS/EHD scheduled for <br /> Tuesday, January 19,1993, at 12:30pwN Left site at 4:10fm Prepared <br /> inspection report. <br /> January 19, 1993 (site inspection 2.0 hours) <br /> Site inspection. Arrived on site approximately 12:30pM Set-up completed <br /> prior to arrival. Perforation commenced and was completed at <br /> approximately 2:30pm Prepared inspection report. <br /> o <br />