Laserfiche WebLink
V <br /> RESNA <br /> SITE SAFETY PLAN <br /> FACII.ITY BACKGROUND <br /> Unleaded product line from tank no. 2 leaked product. The product line was repaired and <br /> the tanks were recertified. Elevated levels of gasoline hydrocarbons were recorded in two <br /> of four soil samples collected adjacent to the product line. <br /> WORK PLAN <br /> Task One: Excavation of approximately 10-15 yards of <br /> hydrocarbon impacted soil from in the area of <br /> the detected product line leak. <br /> I <br /> Task Two: Confirmation Sampling. Five confirmation soil <br /> samples will be collected to verify source <br /> removal. <br /> i <br /> Task Three: Backfilling, subsequent to the collection of the <br /> confmnation soil samples the excavated area will <br /> be backfilled under requirements set fourth by <br /> the City of Stockton Public Works Department. <br /> ' I <br /> i <br /> r <br /> I <br /> PAGE 2 <br />