My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
R A BRIDGEFORD
>
7850
>
2200 - Hazardous Waste Program
>
PR0521781
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2024 2:28:14 PM
Creation date
3/12/2020 1:56:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0521781
PE
2229
FACILITY_ID
FA0014789
FACILITY_NAME
SJC PERMANENT HOUSEHOLD HAZ WASTE
STREET_NUMBER
7850
Direction
S
STREET_NAME
R A BRIDGEFORD
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
7850 S R A BRIDGEFORD ST
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
907
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SJCHHWCF <br />Haze jour Waste Oil Tank <br />Design of tank: The tank is a double walled UL 142 tank with integral secondary <br />containment. Associated with the tank is an air operated diaphragm pump with <br />12 feet of transfer hose and piping. The tank is fitted with a level gauge and a <br />level switch and horn with sounds at 90 percent full and stops the transfer pump. <br />A waste collection trough is adjacent to the tank, which is kept empty at the end <br />of daily operation. The tank, trough, transfer pump and inlet fitting to the tank all <br />have secondary containment trays or tank made of steel. <br />Visual inspection of containment area: Inspection of the secondary containment <br />interstice found it dry with no evidence of leakage. <br />Secondary Containment findings: The secondary containment systemof <br />sufficient capacity and condition for the containment of releases from all As <br />"Mil <br />Site Security: <br />Initials: <br />The site is located on the Stockton Airport Grounds and is patrolled by the <br />Stockton Police Department. <br />Discrepancies: <br />The following items need correction. <br />Waste collection trough requires secondary containment. <br />The oil transfer pump requires secondary containment. <br />The oil line tank entry nozzle requires secondary containment. <br />The tank requires grounding. <br />Overfill protection needs checking and calibration. <br />The tank requires seismic anchoring. <br />As of June 11, 2009 all discrepancies above have been corrected by Bagley <br />Equipment Company. <br />Strandberg Associates 348 Concord Dr Menlo Park, CA 94025 10 <br />rwaterguvCaNwaterguv.com (866) 388 0404 or (650) 329-8918 <br />
The URL can be used to link to this page
Your browser does not support the video tag.