Laserfiche WebLink
STI SP001 Annual Inspection Checklist <br />General Inspection Rdorniation: <br />Ir Oafe: P?tain Urtii 0.+le: 3 // (36morrl'C fmn'ncpaan an,) <br />S � <br />(D C7 <br />C) _ <br />@ <br />»xr kapociarNmc: �e Nr -.9,w-A4 vof ye. Fr C.d37rJ10.4 <br />s): , <br />�I�sTf dim 7-71ro7 <br />N <br />onz m <br />Inspection Guidance: <br />Fa' egVipleM Mirxludd in Rbs siaMd, fiYothemcmmrddN insp_CGONtesting sxhcdula and procedures. <br />I%Pedtgn <br />The periodic AST t intended for *m% the exte nal AST condition and Its containment 14LL]cervi nre- Thi, ynuW inspection does not hewn, a cert/ Imp,,,,,. a <br />C <br />ll be <br />shall Performed by an owner's Inspector who $ familiar iamth the ate and can Identify changes and devetopilg problereS. Inspect the AST shall and as9aeateci Piping, <br />tp <br />varves, and pumps indrding inspection or the<aating fpr paint Failure, inspect. <br />m <br />1. Earthen elntat^entshgctunes Including examinationm <br />for hoe$, whxt, and cracking in addition To 11w degrese <br />tlabon and tank "- <br />8 <br />I. Commate containment structures and tank foundatiortMsuppera including axanFnFtion Forlwles, w Ott, setting, Paint failure, In addition on examination far �Wroslaft <br />Co, <br />and leakage. <br />C) <br />3. Steel containment btmctures and tank foundatiorWsuppom, including examination (erwmhuut, Setow , cracking,for <br />and Palm ]allure, M adN1FYl t0 <br />O <br />Cxamiretk n for CCtrabion and leakage. <br />rnn <br />lnspttTionttcathodicprpttttionsystem, ifapphrable, Includes the wire connections For ahnitne <br />9 aYvtems and Mthe apeatkval mmpamm� (power <br />co <br />swath,meters,and alxms)dfimpref,bd wrr4 tsyslems, <br />w 2 <br />REmove prompW upon d-gtovery standing wally w liquid in the primary tsd, secondary mntaimnaet uc», ink voce, or spill conlalmr. Before d5alnarge to the emtrennxnt, <br />COp <br />Inspect lne llquiT for reguyted PraduM mother contaminants and disposed of ltpropety. <br />m -+ <br />o <br />In orderto comply with EPASPCC(Soil preetvytion, Cantrpl old CW,,,rmeas'uR) Mies, d fatllity mrbt regJarly lql squid k+Cl Sensing deNces m ensure elopes operation <br />(40 CFR 112.0(C)(0)(v)). <br />p 3 <br />(r) deslglaRs an item in a ran-mnformanmslaws. ThE indkaleb that action is mquimd to a19drzs a problem. <br />O O <br />Npmconforrmng IMIn ImfgrtaM ro tank w containment irxenritY ad <br />RgWACGvani ft anbyaneneridin conrecxe act AST design, cont <br />ono will determine the comxave amara. Nate the, non-Gonf(rmentx and mr.csyonding Carlx[Ive.acibn In the carmen[ Retain <br />pp <br />w <br />ent section- <br />sectim-octar,n the co <br />for the completed <br />checklists Fpr 36 months. <br />checklists <br />N � <br />Complete INSOecklist err an anal bads supplement;; W tta owner monthly-perfannt'd nspactgnn checklists.. <br />o C) <br />Note If a<bmrge has oeearrad W the tank 6116t6rrr OF mMalnmentUtal may aRert the SPS plan, the candltlon shoukt be evaluated agai,,t tb, arrerlt pian <br />ca> <br />requircmmttby a Prefe65iunil ENkrwerlonaMidgeabta to SPCC denelopmatt and Implementation. <br />A <br />m CD <br />re. N <br />on N <br />N <br />AST INSPECTION STANDARD ( v ^^ <br />S � <br />(D C7 <br />C) _ <br />n <br />� 'TI <br />7 <br />N <br />N <br />5 <br />rn <br />N <br />a <br />O <br />INN <br />N <br />0 <br />O <br />C <br />[nC <br />G <br />N <br />c m <br />(D <br />p <br />i <br />D <br />— <br />CJ> it <br />v <br />W <br />�t <br />11 <br />Z <br />O <br />rr <br />r <br />