|
STI SP001 Annual Inspection Checklist
<br />General Inspection Rdorniation:
<br />Ir Oafe: P?tain Urtii 0.+le: 3 // (36morrl'C fmn'ncpaan an,)
<br />S �
<br />(D C7
<br />C) _
<br />@
<br />»xr kapociarNmc: �e Nr -.9,w-A4 vof ye. Fr C.d37rJ10.4
<br />s): ,
<br />�I�sTf dim 7-71ro7
<br />N
<br />onz m
<br />Inspection Guidance:
<br />Fa' egVipleM Mirxludd in Rbs siaMd, fiYothemcmmrddN insp_CGONtesting sxhcdula and procedures.
<br />I%Pedtgn
<br />The periodic AST t intended for *m% the exte nal AST condition and Its containment 14LL]cervi nre- Thi, ynuW inspection does not hewn, a cert/ Imp,,,,,. a
<br />C
<br />ll be
<br />shall Performed by an owner's Inspector who $ familiar iamth the ate and can Identify changes and devetopilg problereS. Inspect the AST shall and as9aeateci Piping,
<br />tp
<br />varves, and pumps indrding inspection or the<aating fpr paint Failure, inspect.
<br />m
<br />1. Earthen elntat^entshgctunes Including examinationm
<br />for hoe$, whxt, and cracking in addition To 11w degrese
<br />tlabon and tank "-
<br />8
<br />I. Commate containment structures and tank foundatiortMsuppera including axanFnFtion Forlwles, w Ott, setting, Paint failure, In addition on examination far �Wroslaft
<br />Co,
<br />and leakage.
<br />C)
<br />3. Steel containment btmctures and tank foundatiorWsuppom, including examination (erwmhuut, Setow , cracking,for
<br />and Palm ]allure, M adN1FYl t0
<br />O
<br />Cxamiretk n for CCtrabion and leakage.
<br />rnn
<br />lnspttTionttcathodicprpttttionsystem, ifapphrable, Includes the wire connections For ahnitne
<br />9 aYvtems and Mthe apeatkval mmpamm� (power
<br />co
<br />swath,meters,and alxms)dfimpref,bd wrr4 tsyslems,
<br />w 2
<br />REmove prompW upon d-gtovery standing wally w liquid in the primary tsd, secondary mntaimnaet uc», ink voce, or spill conlalmr. Before d5alnarge to the emtrennxnt,
<br />COp
<br />Inspect lne llquiT for reguyted PraduM mother contaminants and disposed of ltpropety.
<br />m -+
<br />o
<br />In orderto comply with EPASPCC(Soil preetvytion, Cantrpl old CW,,,rmeas'uR) Mies, d fatllity mrbt regJarly lql squid k+Cl Sensing deNces m ensure elopes operation
<br />(40 CFR 112.0(C)(0)(v)).
<br />p 3
<br />(r) deslglaRs an item in a ran-mnformanmslaws. ThE indkaleb that action is mquimd to a19drzs a problem.
<br />O O
<br />Npmconforrmng IMIn ImfgrtaM ro tank w containment irxenritY ad
<br />RgWACGvani ft anbyaneneridin conrecxe act AST design, cont
<br />ono will determine the comxave amara. Nate the, non-Gonf(rmentx and mr.csyonding Carlx[Ive.acibn In the carmen[ Retain
<br />pp
<br />w
<br />ent section-
<br />sectim-octar,n the co
<br />for the completed
<br />checklists Fpr 36 months.
<br />checklists
<br />N �
<br />Complete INSOecklist err an anal bads supplement;; W tta owner monthly-perfannt'd nspactgnn checklists..
<br />o C)
<br />Note If a<bmrge has oeearrad W the tank 6116t6rrr OF mMalnmentUtal may aRert the SPS plan, the candltlon shoukt be evaluated agai,,t tb, arrerlt pian
<br />ca>
<br />requircmmttby a Prefe65iunil ENkrwerlonaMidgeabta to SPCC denelopmatt and Implementation.
<br />A
<br />m CD
<br />re. N
<br />on N
<br />N
<br />AST INSPECTION STANDARD ( v ^^
<br />S �
<br />(D C7
<br />C) _
<br />n
<br />� 'TI
<br />7
<br />N
<br />N
<br />5
<br />rn
<br />N
<br />a
<br />O
<br />INN
<br />N
<br />0
<br />O
<br />C
<br />[nC
<br />G
<br />N
<br />c m
<br />(D
<br />p
<br />i
<br />D
<br />—
<br />CJ> it
<br />v
<br />W
<br />�t
<br />11
<br />Z
<br />O
<br />rr
<br />r
<br />
|