Laserfiche WebLink
STI SP001 Annual Inspection Checklist <br />]rsnamr�Oate: y/A,�LlLfS Rt4in (Mil0.alc: Y/';, //I r3Grr:nmErrpnvina%c) <br />Prar rrtgcam �: Lsayt+a-Nene: r�pH.v ��'j ii'!I�'���G <br />yadclr�aJtti (IDa's)��..i. � /r.i <br />Inspection Guidance: <br />Far mvipmart not included in this sbndard, follow the rrmmlfacaaer recommended irtgectipNtescirq schedules and pmcedhres. <br />Tha periodic AEFT In6PCnign is intendod Por mmiwring the esirehal AST cordrtpn ab itsmnbrmneM sbuMR. Ttzs vmAsl inspechm dog not require a wshfed iwo nsr it <br />shellbspnfmned by an w,,Ws impgtterwtpayamiysrwiththosioaadcan identifychange and developing probkms.Ine,eathe AST shell and associated Ppmg, <br />vatw_s, and pumps imlWm in oee0on of the coating far Paint FailoR. tnspacc <br />1. Conceit mntatnmen[ sburLrres and <br />t ng evdminMMn lir nal6, nelod nt, and cra,J,n in a tees, was 4N:rda,jin Mian antl rank In addition <br />Z. Conceits le ltage.nmentstrumres aed tank faurdMiorNwppafs inJutl'ug eramNatMn for holes, washmA, sM[lirg, paint falmt in ateLtisn to eaaminetMn Mr cgrrasian <br />and leakage. <br />3. Steel mnasn vert sMehires and tank foundaboW%oaons imludirq a<aminotlon for waslnu4 seti rraWng, and ra paint failure, In aadidan w <br />ezanrnapon <br />for corrosion and leakage. <br />Inspection of eathodlc protecbas systan, if applicable, melotias the wee connections for govaec sysmr,, and'Aaual rnsptenm of the aWatlanal components (poser <br />mihh, makes, and alarms) of impressed curnmc ngsterns. <br />Rwnaw PernPtly span dswvny standing avatar ar tigpd in the prirnvytank, woor4ary mreainment ansa, ndenshm, or sell container. Before dmharge to the arvlronmenL <br />To older <br />ldeligod far th EPA SPCC <br />(Sts a oMa' or, nd 05paad of Itpap ks, <br />to CFR comply vdM EPA SPDC (Spill PRVMIian, CO."CgNsal and CMrntarrnemrR) rules, a faOliN relit Rgulady test squid rove{ sensing tlNiCes fo ensure proper operation <br />(d0 CFR <br />an 117.5ten, <br />in <br />('J dHpnates an m n a nananfenyanoe ztahc. Thin intliWez Mal Action is RquiRd ro addne,, a problem. <br />Nort-conforming items immrbm M k K' df/ regwre eveluMkar lir an alglnCre�periensd N AST design, a cMif� ingseclw, qrp tRrk <br />manufacturer wm MltdNen'nim Ne mrreoiw! anion. Nate [he rwr'cvrfornsante dn0 mneapdndinq CIXrectivq attign En tM1e commgrl[ section. Retain his aamplated <br />cneckrrstsfar 36 mamM. <br />Completethii tlsxkhs: man annoal basimpdemenbi to the saner monmly-pledoms V inspeUon Checklists. <br />Nate: Ifo ci+arge has oppurretl m th tank ryslan wmntalnmarKthat mayal/eatlse SPCC plan, the mWiem should 6e evaluaaedapNrMNetprrent plan <br />rogtdrertwnt by a Wule"lona) EMinear ImowdedgeaWa In SPCC davalop cant and hrlplemeraadon. <br />AST INSPECTION STANDARD <br />JULY I9O5 <br />r—� <br />N IT <br />rnS <br />C4 �e <br />N <br />O <br />CT 1 ■ <br />ria"a <br />