My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012591
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARKET
>
22
>
3500 - Local Oversight Program
>
PR0545536
>
ARCHIVED REPORTS_XR0012591
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2020 12:04:41 AM
Creation date
3/12/2020 2:00:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012591
RECORD_ID
PR0545536
PE
3528
FACILITY_ID
FA0001506
FACILITY_NAME
STOCKTON POLICE DEPARTMENT
STREET_NUMBER
22
Direction
E
STREET_NAME
MARKET
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
14904001
CURRENT_STATUS
02
SITE_LOCATION
22 E MARKET ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> WaterWork <br /> i <br /> Health and Safety Plan <br /> i Underground Tank Investigation <br /> IN'T'RODUCTION <br /> C <br /> PURPOSE AND SCOPE <br /> The. Health and Safety Plan, for underground tank investigations, <br /> Provides for the protection of on-site personnel and the <br /> r.. . surrounding community during site characterization activities. ' <br /> 4 The requirements, specifications and procedures presented with <br /> this plan will ' apply to all personnel on-site, including ' <br /> employees, sub-contractors, site visitors and regulatory agency <br /> personnel. <br /> _ E <br /> KEY PERSONNEL. ti <br /> WaterWork's Safety Coordinator/Pr <br /> o$ect Manager will provide <br /> training to. site personnel in the use of safety and personal <br /> Protection equipment and will manage the on--site monitoring <br /> program. The Safety Coordinator/Project Manager will have the <br /> authority to . deny access to any individual without the proper <br /> :ainin or <br /> g pr <br /> totective .equipment required for the site conditions <br /> or those Individuals disregarding site safety procedures. All i <br /> site personnel will be under the direction of. the Safety <br /> Coordinator/Project Manager. <br /> HAZARD ANALYSIS: <br /> The property previously operated a <br /> gasoline and/or diesel fuel <br /> distribution facility. Historic data and evaluation of <br /> subsurface indicate the presence or potential presence of <br /> 3 '. hydrocarbon fuel contamination. <br /> The actives addressed by this safety activities y plan include .surface and <br /> subsurface soil and groundwater sample _c_ol_le,ction. ----These-------- <br /> .r <br /> activities present-the-potential far exposu*e to taxlc materials <br /> Na through: both .skin contact and Inhalation. The subsurface <br /> sampling may also pose a fie and explosion hazard from gases and <br /> vapors trapped beneath the ground surface <br /> Y <br /> `jg <br /> r $ x <br /> all uim�aavtn' <br />
The URL can be used to link to this page
Your browser does not support the video tag.