Laserfiche WebLink
Ground Zero Analysis, Inc. ? <br /> SITE SAFETY PLAN <br /> Physical Hazards <br /> as[c(s1 '' ` Hazard Mitigation 1V)easure 11. ::;:;: :: <br /> 1,2 Heavy Equipment (Noise &Physical All heavy equipment used on this project will be <br /> contact) in good working order and operated in accordance <br /> with recognized industry standards and Cal- <br /> OSHA Title 8, Subchapter 4, Construction Safety <br /> Orders. In addition, an exclusion zone applies to <br /> all personnel. The exclusion zone will be 20 feet <br /> to the front and either side of the operating drill <br /> rig. Personnel will not be allowed under booms or <br /> augers at any time. <br /> All equipment operators and ground crews <br /> working in close proximity of heavy equipment <br /> will be supplied with ear protection. <br /> 1,2 Dust The dust hazard will be mitigated by not allowing <br /> ground crew to be located down wind of drilling <br /> and excavation activity. In addition, water will <br /> be applied to control the dust if visible levels of <br /> dust are generated. <br /> Fire and Explosion Hazards <br /> List Flammable or Combustible materials on-site. Keep sources of ignition away from these <br /> materials. <br /> ::: o <br /> ..Flammable (Flash Pont 1 O0 F� Combustible (Frash Pomj <2Q0 �Fi <br /> Gasoline Motor oil <br /> Type and Location of Fire Extinguishers (Show on map for large projects) <br /> Dry chemical fire extinguishers, Class A, B, and C, are stored in all GZA vehicles. <br /> PAGE 4 <br />