Laserfiche WebLink
Ground Zero Analysis, Inc. <br /> SITE SAFETY PLAN <br /> On-site communications: ❑ Radio 1XI Verbal ❑ Hand Signals <br /> ❑ Other <br /> Designate hand signals here: <br /> Off-site communications: ❑ Radio El Telephone <br /> ❑ Other <br /> The specific signal for an emergency is: Verbally Given <br /> The specific signal for an evacuation is: Verbally Given <br /> Evacuation assembly point is: Office building <br /> MARK EVACUATION ROUTE(S) ON SITE MAP O CHECK WHEN DONE <br /> SANITATION AND DECONTAMINATION <br /> Personnel Decontamination Procedure: <br /> All contaminated personal protective equipment lie gloves coveralls) will be placed on and <br /> covered with 6-mil plastic sheeting along with the drill cuttings. <br /> Location of Wash Water. At site. <br /> Location of Toilet: At site. <br /> Location of Drinking Water: At site. <br /> MARK LOCATION OF EYEWASH AND SHOWER DRENCH ON SITE MAP O CHECK WHEN <br /> DONE <br /> Equipment Decontamination Procedure: Equipment will be washed with a trisodium <br /> I <br /> phosphate solution and/or st <br /> eamclea <br /> ned. <br /> I <br /> Materials to be Disposed of as Hazardous Waste: All soil and water produced will be stored on- <br /> site until appropriate disposal methods are <br /> determined. <br /> t <br /> PAGE 8 <br />