Laserfiche WebLink
GENERAL PROVISIONS <br /> 1 VALIDATION — This permit is not valid unless signed by the Public Works Directo•or his authorized representative <br /> 2 REVOCATION — This permit is non-transferable and is void if work is not completed prior to expiration date An extension may be granted <br /> if such extension is requested forty-eight hours before the permit expires <br /> 3 ACCEPTANCE OF PROVISIONS — It is understood and agreed by the permittee that the doing of any work under the permit shall constitute <br /> an acceptance of the provisions <br /> 4 KEEP PERMIT ON JOBSITE — The permit and control number shall be kept on the jobsite and shall be shown to any representative of the <br /> City requesting verification of permit issuance <br /> 5 INSPECTION Aw APPROVAL --- A nunimum of(24) twenty-four hours notice shall be required prior to placing any backfill connection <br /> to any existing facility or the placement of any concrete or paving work Inspection shall not be deemed a waiver on the part of the City of <br /> the righfto demand'correction of defects discovered at a subsequent date <br /> 6 STANDARD SPECIFICATIONS — All work shall conform to the City of Stockton standard specifications <br /> 7 MINIMUM INTERFERENCE WITH AND PROTECTION OF TRAFFIC — All work shall be planned and carried out so there will be the least <br /> possible inconvenience to the traveling public Placing of lights barricades warning signs and other safety devices required for public safety <br /> shall be the responsibility of the permittee Alt safety provisions and devices shall conform to the requirements of Chapter 5 of the State of <br /> California Traffic Manual <br /> 8 FAILURE TO COMPLY W[TKGENERAL PROVISIONS — The permittee agrees to reimburse the City for performing all work and furnishing <br /> all material to correct any failure to comply with these provisions as well as all applicable City ordinances and standards and specifications <br /> currently in effect <br /> 9 NOTIFICATION OF UTILITY COMPANY — The permittee shall notify utility companies 48 hours prior to beginning any construction which <br /> may involve underground or overhead facilities and will pay all expenses for any removal or relocation necessary Valves on water mains may <br /> not be turned off without permission of the utility company involved <br /> ' 10 NOTIFICATION OF POLICE, FIRE AND PUBLIC WORKS DEPARTMENTS — When streets are to be blocked the Police Fire and Public <br /> Works Departments are to be notified each day the street is to be blocked and/or when traffic is delayed or hindered Access to fire hydrants <br /> shall be maintained at all times Streets will not be closed without prior approval of City Traffic Engineer and Permit Engineer <br /> 11 CLEANUP OF JOSSITE — The permittee will remove any refuse material from the fobsite within three days atter completion of the work <br /> 12 DELINQUENT BILLS — Failure to pay any delinquent bill accrued under any previous permit issued by the Department of Public Works will <br /> i <br /> be cause for rendering the applicant ineligible for any other permit from the Department of Public Works until such bill is paid <br /> j ' 13 MEETING EXISTING IMPROVEMENT — The permittee shall be responsible for meeting all adjacent frontage improvements such as paving <br /> and sidewalks <br /> TO THE PERMITTEE <br /> ' To provide a more efficient and economical inspection service for Encroachment Permit Construction,we are asking that the following procedure <br /> be followed by all permittees f <br /> 1 Ngtify the Permit Engineer 1209)937-$411 and obtain a control number at least twenty-four(24)hours prior to the start of work <br /> 2 Discuss with the Permit Engineer or inspector any unusual or difficult features of the construction <br /> 3 Advise Permit Engineer of name and phone number of contact person for the project prior to beginning work <br /> 4 Notify the Permit Engineer one day in advance to cancel a scheduled inspection or to request an additional or earlier inspection <br /> ' 5 Notify the Permit Engineer upon completion of construction (209)937 8411 <br /> INSPECTION SCHEDULE <br /> ' Listed below are several types of construction and points at which inspection must be made pnor to continuing construction operation Unauthorized <br /> continuance of Construction beyond an inspection pont may result in rejection of all work <br /> CONCRETE PIPE LAYING <br /> 1 Grade and excavation before forming 1 Excavation and bedding <br /> 2 Forms before placement of concrete 2 Pipe laying <br /> 3 Cleanup and final approval 3 Backfill(compaction test may be required) <br /> 4 Final approval <br /> I <br />