Laserfiche WebLink
aCl <br /> • Ms Devra Lewis Page 5 <br /> Regional Water Quality Control Board Clayton Project No. 70-03759.00 <br /> September 3, 2004 <br /> Attachments: Figure I —Site Location Map <br /> Figure 2 —Pipeline Alignment-Neighborhood E <br /> Figure 3 —Pipeline Alignment Sampling Results <br /> Figure 4— Soil Sampling Results <br /> Figure 5 —Main Excavation Sampling Results <br /> Figure 6-Post Remediation Soil Concentrations <br /> Figure 7—TPH Concentrations in Groundwater <br /> Table 1 —Summary of Post-Remedial Soil Analytical Data <br /> Table 2—Summary of Groundwater Sampling Data <br /> Attachment A—Field Data Sheets <br /> Attachment B—Laboratory Analytical Sheets <br /> cc: See Distribution List <br /> • <br /> S:\ TROIECiS\20JM759 Sheil Memttsm Hoo \GW inNneighbd' Ewnmmrybunnu repo dw <br />