My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
713
>
2300 - Underground Storage Tank Program
>
PR0521604
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2021 11:59:42 AM
Creation date
3/12/2020 3:54:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0521604
PE
2371
FACILITY_ID
FA0014678
FACILITY_NAME
NATIONAL PETROLEUM
STREET_NUMBER
713
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13905214
CURRENT_STATUS
01
SITE_LOCATION
713 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST <br /> TP-201 . 3 <br /> UST Static Pressure Performance Test Report Form <br /> Permit Number: Test Company: Confidence UST Services, Inc . <br /> Confirmation : Technician: Alan Johnson <br /> Site Name : Stockton Gas Certification Number Expiration Date <br /> Site Address : 713 N EI Dorado Street District: SJV-0267 9/30/2019 <br /> City/Zip : Stockton 95202 Franklin (Healy) : 1001973708 04/08/2021 <br /> Date/Time of Test: 5/10/2019 at Veeder-Root: B45536 06/21 /2019 <br /> TEST INFORMATION <br /> Number of nozzles : 12 Are the tanks manifolded? 0 Yes ❑ No <br /> Phase I vapor recovery system executive order as referenced on Permit to Operate) VR-102 <br /> Phase 11 vapor recovery system executive order as referenced on Permit to Operate) VR-202 <br /> Nitrogen introduction point 0 Phase I vapor coupler ❑ Phase H vapor riser <br /> Pressure measuring device ❑ incline manometer 0 digital manometer ❑ mechanical gauge <br /> Calibration date for pressure measuring device must be within 90 days of the test) 03/20/2019 <br /> Ending value for digital manometer drift test if applicable (must be 0 . 01 in. w.c. or less) 0.00" <br /> Initial tank ullage pressure (vent if over 0 . 5 in. w. c.) 0.34" <br /> Nitrogen introduction flow rate, F (must be between 1 and 5 CFM) 1 .6 CFM <br /> Calculated ullage fill-time, t2 (t2 = V / 1522 x F) 6 min 16 sec <br /> Actual fill-time 4 min 48 sec <br /> Number of hoses with over 100 ml (balance hoses must be drained prior to testing) 0 <br /> TANK INFORMATION <br /> Tank No . 1 2 3 4 All <br /> Product Grade T1 : 87 T2 : 91 <br /> Actual tank capacity (gallons) 30,063 11 ,849 41 ,912 <br /> Gasoline volume (gallons) 15, 623 73193 22,816 <br /> Ullage, V (gallons) 149440 41656 19,096 <br /> If tanks not manifolded, # of nozzles <br /> 2 IN. W. C. STATIC PRESSURE TEST <br /> Test No . 1 2 3 4 5 <br /> Start time 11 :25 am <br /> Initail Pressure, inches of water column 2.00" <br /> Pressure at one minute, in. w. c. 2.00" <br /> Pressure at two minutes, in. w.c . 2.02" <br /> Pressure at three minutes, in. w. c. 2.01 " <br /> Pressure at four minutes, in. w. c. 2002" <br /> Pressure at five minutes, in. w. c . 2.03" <br /> Allowable minimum pressure, in. w.c. 1 .95" <br /> Pass / Fail (enter "GF" for gross failure) Pass <br /> I declare, under penalty ofpeijury under the lmvs of the state of California that based on information and belief formed after <br /> reasonable inquiry, the statements and information provided in this document are true, accurate, and complete. <br /> Signature if Technician: <br /> OF&4 <br /> 000000: Date : 5/10/2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.