My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MCDONALD
>
12988
>
3500 - Local Oversight Program
>
PR0545540
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2020 12:35:29 PM
Creation date
3/13/2020 11:23:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545540
PE
3528
FACILITY_ID
FA0004175
FACILITY_NAME
TIKI LAGUN RESORT & MARINA
STREET_NUMBER
12988
Direction
W
STREET_NAME
MCDONALD
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
13102026
CURRENT_STATUS
02
SITE_LOCATION
12988 W MCDONALD RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TIKI LAGUN LTD. <br /> Page 2 <br /> 2. enable the regulatory agency to review and approve the proposed cost-effective corrective <br /> action alternative before any corrective action work was performed; and <br /> 3. ensure the Fund will only reimburse the most cost-effective corrective-action alternative <br /> required by the regulatory agency to achieve the minimum cleanup necessary to protect <br /> human health, safety and the environment. <br /> In some limited situations interim cleanup will be necessary to mitigate a demonstrated <br /> immediate hazard to public health, or the environment. Program regulations allow the <br /> responsible party to undertake interim remedial action after: (1) notifying the regulatory agency <br /> of the proposed action and; (2)complying with any requirements that the regulatory ory agency may <br /> set. Interim remedial,action should only be proposed when necessary to mitigate an immediate <br /> demonstrated hazard.Implementing interim remedial action does not eliminate the <br /> requirement for a CAP andan evaluation of the most cost-effective corrective action <br /> alternative. <br /> Three bids and Cost Preapproval: Only corrective action costs required by the regulatory <br /> agency to protect human health, safety and the environment can be claimed for reimbursement. <br /> You must comply with all regulatory agency time schedules and requirements and you must <br /> obtain three bids for any required corrective action. Unless waived in writing, you are required <br /> to obtain preapproval of costs for all future corrective action work. If you do not obtain three <br /> bids and cost preapproval, reimbursement is not assured and costs may be rejected as <br /> ineligible. <br /> If you have any questions,please contact me at(916)227-4334. <br /> Sincerely, <br /> nnabel Mackey pQ <br /> Claim Review Unit <br /> Underground Storage Tank Cleanup Fund <br /> cc: -Mr. Gordon Boggs Ws. Margaret Lagorio- <br /> RWQCB, Reg. 5 -Sacramento San Joaquin County EHD 1 <br /> 3443 Routier Road P.O. Box 2009 <br /> Sacramento, CA 95827-3098 Stockton, CA 95201 <br /> Our mission is to preserve and enhance the quality of California's water resources,and <br /> Recycled Paper ensure their proper allocation and efficient use for the benefit of present and future generations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.