My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MCHENRY
>
1905
>
3500 - Local Oversight Program
>
PR0545542
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2020 12:01:26 PM
Creation date
3/13/2020 11:27:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545542
PE
3528
FACILITY_ID
FA0004254
FACILITY_NAME
ESCALON PREMIER BRANDS
STREET_NUMBER
1905
Direction
S
STREET_NAME
MCHENRY
STREET_TYPE
AVE
City
ESCALON
Zip
95320
APN
22514059
CURRENT_STATUS
02
SITE_LOCATION
1905 S MCHENRY AVE
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD <br /> CENTRAL VALLEY REGION <br /> 3443 Routier Road, Suite A � <br /> Sacramento, CA 95827 <br /> Ar � <br /> ,9 <br /> NOTICE OF PUBLIC HEARING <br /> and <br /> Notice of Application for Renewed Waste Discharge Requirements�M�S 2T�1 yFq/ <br /> (National Pollutant Discharge Elimination System Permit) /CFS Ty <br /> for <br /> ESCALON PACKERS, INC. <br /> SAN JOAQUIN COUNTY <br /> Escalon Packers, Inc., has requested a renewal of waste discharge requirements for the discharge <br /> of noncontact cooline water and/or evaporator water.during_emergency�conditions (mechanical. <br /> failuie of-its cooling towers) during its processing season,'from June through October. When <br /> discharge is necessary, approximately 2.3 mgd will be released to the Stanislaus River via the <br /> San Joaquin County Main District Canal. Process wastewater from the facility is discharged to <br /> the City of Escalon's wastewater treatment plant. The existing discharge is governed by Waste <br />___-Discharge Requirements Order No. 90-169 (NPDES No. CA0081426). <br /> A public hearing concerning this matter will be held: <br /> DATE: Friday, 23 June 1995 <br /> TIME: 9:00 a.m. <br /> PLACE: California Integrated Waste Management Board <br /> 8800 Cal Center Drive <br /> Hearing Room, 1 st Floor <br /> Sacramento, California <br /> Persons wishing to'comment on or object to the proposed requirements are invited to submit <br /> same in writing to the Regional Board no later than 5 Junet 4995. All comments or objections <br /> received by this date will be considered in the draft waste discharge requirements. <br /> - Additional pertinent information may received by the Board; upon—1-6-request any <br /> interested person at;the meeting. After considering comments or objections, the Board may issue <br /> waste discharge requirements. Any action of the Board may be appealed to the State Water <br /> Resources Control Board within 30 days of the action. <br /> Anyone having questions on these requirements should contact the project representative, <br /> Kathryn Gaffney, at (916) 255-3072. The proposed requirements and related documents may be <br /> inspected and copied at the Regional Board's office at 3443Routier Road, Suite A, Sacramento, <br /> California, weekdays between 8:00 a.m. and 5:00 p.m. by appointment. <br /> Please bring the above information to the attention of anyone you know who would be interested <br /> in this matter. <br /> rc <br /> JACK E. DEL CONTE, Supervising Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.