Laserfiche WebLink
April 14, 1993 Project No. EK-6032-2 <br /> �7 <br /> SANITATION AND DECONTAMINATION <br /> Personnel Decontamination Procedure: Hands and face will be washed before smoking-drinking <br /> and eatinia. <br /> Location of Wash Water: Water in ESE vehicle <br /> Location of Toilet: Thorsen building <br /> Location of Drinking Water: ESE vehicle <br /> Mark Location of Eyewash and Shower drench on site map NA Check when done <br /> Attach Decontamination Line chart if applicable Check when done <br /> Equipment Decontamination Procedure Equipment will be cleaned with Alconox Solution. <br /> Decontamination Equipment/Supplies needed: Two 5 gallon buckets.Alconox, cloth <br /> Materials to be Disposed of as Hazardous Waste: Gloves <br /> EMERGENCY RESPONSE <br /> In case of emergency the site safety officer must be notified. The site safety officer or his/her <br /> alternate will notify outside emergency response agencies (ER) as needed, the branch safety <br /> officer, and the project supervisor/manager. The branch safety officer will make any required <br /> reports to local, state and federal agencies. Other emergency notifications will include: <br /> ER Agency: Fire and Police Phone 911 <br /> ER Agency: Phone <br /> Site Safety Officer: Allan Fetko On-Site Phone <br /> Pager# (916, 5} 51_4338 <br /> Project Manager: Allan Fetko Office Phone (209) 957-5317 <br /> Pager# 916 551A338 <br /> 8 <br />