My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MCKINLEY
>
0
>
2900 - Site Mitigation Program
>
PR0009306
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2020 1:47:13 PM
Creation date
3/13/2020 1:17:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009306
PE
2950
FACILITY_ID
FA0004564
FACILITY_NAME
CITY OF STOCKTON
STREET_NUMBER
0
STREET_NAME
MCKINLEY
STREET_TYPE
AVE
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
MCKINLEY AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 14, 1993 N Project <br /> 3 v. EK-6032-2 <br /> �F <br /> Earth Systems Environmental <br /> SITE SAFETY PLAN <br /> Job Name: McKinleylFrepch Camp Turnpike Project . <br /> Job Location: French Camp Turnpike, Stockton California <br /> Client Name: City of Stockton ftaftment.of Housing and Economic Development <br /> Project Number: EK-6032-2 <br /> SSP Prepared by: Nissa L. Nack <br /> Site Safety Officer: Allan Jin Fetko <br /> This site safety and health plan (SSP) must be kept on-site and accessible to all ori-site employees <br /> during all phases of site operations. The SSP must be reviewed and signed by all on-site <br /> employees, subcontractors, and visitors prior to entering the site. General safe work practices <br /> identified in the Earth Systems Environmental, Inc. (ESE) Injury and Illness Prevention Manual <br /> apply to all ESE work sites. <br /> The provisions set forth in this SSP shall apply to ESE employees and any subcontractors working <br /> for FSE at the job site. All personnel working for ESE at the lob site must read this SSP,and sign <br /> the attached Compliance Agreement before entering the work area. Field personnel may deviate <br /> from the safety provisions set-forth in this SSP, but only to upgrade or increase the safety <br /> requirements. ESE personnel may suspend work if unauthorized modifications to the safety <br /> provisions set-forth in this SSP are made. If changes in site or working conditions require <br /> changes in safety procedures, appropriate amendments to this SSP will be provided by the ESE <br /> project manager or supervisor, with the written approval of a branch safety officer or the ESE <br /> Health and Safety Director. <br /> WORK PLAN <br /> Task One: ExplpmLozy drilling of seven borings and use of a H droPunch- collection <br /> of soil and groundwater samples _ <br /> Task Two: <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.