My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
10100
>
2800 - Aboveground Petroleum Storage Program
>
PR0515795
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 2:36:27 PM
Creation date
3/16/2020 10:01:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0515795
PE
2832
FACILITY_ID
FA0004382
FACILITY_NAME
NORTHWEST PIPE COMPANY
STREET_NUMBER
10100
Direction
W
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
25312041
CURRENT_STATUS
01
SITE_LOCATION
10100 W LINNE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Northwest Pipe Spill Prevention, Control, and Countermeasure (SPCC) Plan 62 <br /> Company Tracy Plant <br /> wU e t Pipe <br /> Company <br /> Title: SPCC Storage Container Inspection& Integrity Testing Guidelines <br /> Step 3: Use the Inspection Schedule Table(Section VII of this guidanoe)to determine if <br /> your tank's INSPECTION REQUIREMENTS, <br /> IV. definitions <br /> These def in itions will help you navigate throng h this guidance, please refer to full definitions in <br /> the SPCC regulations andfor Steel Tank Instihite(STI)SPDD1:Standards for the Inspection of <br /> Aboveground Storage Tanks(61'Edition). <br /> Shop Fabricated Tank..A welded AST fabricated in a manufacturing facility,or a welded AST <br /> without a nameplate with a volume less than or equal to 50,006 US gallons. <br /> Elevated Tank: An aboveground storage tank (AST) not in contact with the ground that is <br /> elevated above the surface of the ground or bottom of a vault that allows for a visual external <br /> inspection of the bottom of the tank. <br /> Fiefd Erected Tank:A welded metal AST erected on-site where it will be used_ The maxin um <br /> height is 50 fee#the maximum diameter is 3D feet_ Or,an AST without nameplate that is more <br /> than 50,066 US gallons with a maximum shell height of 50 feet and a maximum diameter of 30 <br /> feet <br /> Portable Contaim?v A closed-bp AST greater than 55 US gallons not intended for fixed <br /> installation. Drums are considered portable containers. <br /> Ouerfilf Protection: systems, procedures, or devices used to prevent liquids in ASTs from <br /> running over or spilling out during the filling process. Overfill protection is required on all tanks <br /> under the SPCC Rule(40 CFR 122.8(c)(8)). A person with view of a direct response visual level <br /> gaugewho is physically present and in control of a shutoff device during the entire filling process <br /> counts as overfill protection. <br /> V. Disclaimers <br /> This guidance document was developed using information obtained from the Steel Tank Irtstihtte <br /> (STI) SP001: Standards for the Inspection of Aboveground Storage Tanks(61^ Edition)_ This <br /> standard was written to meet the intent cf the EPA's requirements for tank integrity testing set <br /> forth in 40 CFR 112.8(cK6). Certified testing takes into account the tank design, as well as the <br /> tank age and condition_ Certified testing may show decreased tank integrity,such as reduced <br /> wall thickness, corrosion,or damage. These findings may require more frequent inspections_ <br /> In addition, changes in the tank configuration, location, and features may also change the <br /> recommended integrity test interval_ Should certified inspections indicate integrity testing is <br /> required more frequently, this recommended testing interval will supersede the STI Sf'061 <br /> recommendation. <br /> This guidance is i mended to be used for steel ASTs that hold oils as defined by the SPCC Rule <br /> (40 CFR 112). Other tanks that may not meet the intent of the STI SPOD1 standard include high <br /> pressure tanks,plastic tanks,or tanks that hold I iquids other than fiam mable and combustible <br /> liquids_ <br /> Page 2 of d <br /> Last revised 0M&2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.