My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
10100
>
2800 - Aboveground Petroleum Storage Program
>
PR0515795
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 2:36:27 PM
Creation date
3/16/2020 10:01:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0515795
PE
2832
FACILITY_ID
FA0004382
FACILITY_NAME
NORTHWEST PIPE COMPANY
STREET_NUMBER
10100
Direction
W
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
25312041
CURRENT_STATUS
01
SITE_LOCATION
10100 W LINNE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Documentation of Corrective Actions <br /> RICompany <br /> Northwest Pipe San Joaquin County-Environmental Health Department <br /> Aboveground Petroleum Storage Act Inspection Report(02/10/2020) <br /> Pending corrections as per Cesar Ruvalcaba <br /> RequirementsSPCC Plan •nshore Facilities (excluding production <br /> 706 CFR 112.8(c)(2) Failed to provide and maintain adequate secondary containment <br /> The emergency generator was observed with insufficient secondary containment. There was no evident <br /> secondary containment for the belly tank of the generator. All bulk storage tanks must be provided with a <br /> secondary means of containment for the entire capacity of the tank and sufficient freeboard to contain <br /> precipitation. <br /> Corrective Action: <br /> Immediately provide sufficient secondary containment for this and all other tanks at this facility. <br /> A proper containment method for the emergency generator fuel (belly) tank has been identified, and is <br /> described the discharge or drainage control section;the new containment system is also mentioned in SPCC <br /> plan. <br /> Northwest Pipe Company hereby commits to custom fabricate containment with a capacity of-248 gallons, <br /> enough to contain the entire capacity of the 80 gallon belly tank plus sufficient freeboard to contain <br /> precipitation. <br /> NWP has fabricated 2CT as described above. <br /> I ' <br /> 1 I <br /> I � <br /> I , <br /> II <br /> f <br /> 0/ r <br /> '' 1117 <br /> t <br /> /4 <br /> Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.