My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
10100
>
2800 - Aboveground Petroleum Storage Program
>
PR0515795
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 2:36:27 PM
Creation date
3/16/2020 10:01:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0515795
PE
2832
FACILITY_ID
FA0004382
FACILITY_NAME
NORTHWEST PIPE COMPANY
STREET_NUMBER
10100
Direction
W
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
25312041
CURRENT_STATUS
01
SITE_LOCATION
10100 W LINNE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
❑� Northwest Pipe Spill Prevention, Control, and Countermeasure (SPCC) Plan <br /> Company Tracy Plant <br /> Table of Contents <br /> 1.0 Introduction.......................................................................................................................................................1 <br /> 1.1 Purpose.............................................................................................................................................................1 <br /> 1.2 General Applicability and SPCC Plan Preparation Requirement......................................................................2 <br /> 1.3 SPCC Plan Organization and SPCC Rule Cross Reference.............................................................................2 <br /> 2.0 Plan Administration, Certification, and Approval...............................................................................................3 <br /> 2.1 Management Approval, Commitment, and Designated Person ........................................................................3 <br /> 2.2 Professional Engineer(PE)Certification...........................................................................................................4 <br /> 2.3 Location of SPCC Plan .....................................................................................................................................5 <br /> 2.4 Certification of Substantial Harm Determination ...............................................................................................5 <br /> 3.0 SPCC Plan Amendment and Review................................................................................................................5 <br /> 3.1 Amendment of SPCC Plan by Owner or Operator............................................................................................5 <br /> 3.1.1 Non-Technical Amendments.............................................................................................................................5 <br /> 3.1.2 Technical Amendments.....................................................................................................................................6 <br /> 3.1.3 Five-Year SPCC Plan Review& Evaluation......................................................................................................6 <br /> 3.2 SPCC Plan Amendment by USEPA Regional Administrator.............................................................................6 <br /> 4.0 Facility Information............................................................................................................................................8 <br /> 4.1 Facility Description............................................................................................................................................8 <br /> 4.2 Facility Operations............................................................................................................................................9 <br /> 4.3 Discharge History..............................................................................................................................................9 <br /> 5.0 Discharge Prevention—General SPCC Requirements.....................................................................................9 <br /> 5.1 Facility Conformance with Applicable Requirements........................................................................................9 <br /> 5.2 Oil Storage......................................................................................................................................................10 <br /> 5.2.1 Type of Oil and Storage Capacity of Each Container......................................................................................10 <br /> 5.2.2 Discharge Prevention Measures.....................................................................................................................15 <br /> 5.2.3 Discharge or Drainage Controls......................................................................................................................15 <br /> 5.2.4 Spill Predictions..............................................................................................................................................15 <br /> 5.3 Discharge Discovery, Response&Cleanup...................................................................................................15 <br /> 5.3.1 Discharge Response.......................................................................................................................................16 <br /> 5.3.1.1 Response to a Minor Discharge...................................................................................................................16 <br /> 5.3.1.2 Response to a Major Discharge...................................................................................................................17 <br /> 5.3.2 Information and Procedures for Spill Reporting ..............................................................................................18 <br /> 5.3.3 Discharge Report to USEPA Regional Administrator......................................................................................18 <br /> 5.3.4 Disposal Methods for Recovered Materials.....................................................................................................19 <br /> 5.4 Inspections, Tests, and Records.....................................................................................................................20 <br /> 5.4.1 Monthly/Annual Inspection..............................................................................................................................20 <br /> 5.4.2 Periodic Integrity Testing.................................................................................................................................21 <br /> 5.5 Personnel Training and Spill Prevention Procedures......................................................................................22 <br /> 5.5.1 Designated Person Accountable for Discharge Prevention.............................................................................22 <br /> 5.5.2 Discharge Prevention Briefings.......................................................................................................................22 <br /> 5.6 Security..........................................................................................................................................................22 <br /> 5.6.1 Fencing...........................................................................................................................................................23 <br /> 5.6.2 Lighting...................................................................................................................................23 <br /> 5.6.3 Starter Controls...............................................................................................................................................23 <br /> 5.7 Truck Loading & Unloading Requirements& Procedures...............................................................................23 <br /> 5.7.1 Secondary Containment..................................................................................................................................24 <br /> 5.7.2 Loading/Unloading Procedures.....................................................................................................................25 <br /> 5.8 Field Constructed Aboveground Tanks...........................................................................................................25 <br /> 5.9 Conformance with State and Local Applicable Requirements.........................................................................25 <br /> 5.10 Qualified Oil-Filled Operational Equipment.....................................................................................................26 <br /> 6.0 Discharge Prevention—SPCC Requirements for Onshore Facilities (Excluding Production Facilities)..........27 <br /> 6.1 Facility Drainage.............................................................................................................................................27 <br /> 6.1.1 Diked Storage Area Drainage.........................................................................................................................27 <br /> 6.1.2 Diked Area Drainage Valves...........................................................................................................................27 <br /> 6.1.3 Facility Drainage System Design....................................................................................................................28 <br /> 6.1.4 Diversion System Requirements.....................................................................................................................28 <br /> 6.1.5 Drainage Water Treatment Fail-Safe..............................................................................................................28 <br /> 6.2 Bulk Storage Containers.................................................................................................................................28 <br /> 6.2.1 Container Construction ...................................................................................................................................28 <br /> 6.2.2 Secondary Containment..................................................................................................................................29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.