Laserfiche WebLink
Northwest Pipe Spill Prevention, Control, and Countermeasure (SPCC) Plan 39 <br /> Company Tracy Plant <br /> Figure 4.5 Bulk Storage Containers Map (Maintenance) <br /> Spill <br /> Containment 55-gal 55-gal Gancrete <br /> Pallet Waste ail Trans_Fluid <br /> Containment <br /> drums <br /> drums 13erm <br /> ❑ ❑ 500-gal. 500-gal. 50o gal. Covered <br /> 5-gal <br /> Trans. Motor Hydraulic External <br /> Used oil drum Fluid Oil Fluid Storage <br /> a.10Subject to Tank Tank Tank Area <br /> offsite Recycled <br /> disposal <br /> NOT TO SCALE <br />