Laserfiche WebLink
®Northwgst Pipe Spill Prevention, Control, and Countermeasure (SPCC) Plan 48 <br /> +--. Company Tracy Plant <br /> Appendix C SPCC Plan Review & Amendment Log <br /> SPCC Plan Review & Amendment Log <br /> PE Certification <br /> Date Amendment Type Amendment' Required?' Amendment By' Signature <br /> ❑Technical <br /> 05/31/2018 ❑ Non-Technical ®Yes Mr.B.J.Atkins :, <br /> ® 5-Yr Review El No Environmental HELP, � <br /> ❑ Regional Administrator Inc. <br /> ly <br /> ® Technical <br /> 07/08/2019 ❑ Non-Technical Per CUPA APSA Inspection Report dated ®Yes Mr.B.J.Atkins <br /> ❑ 5-Yr Review 1/8/19[CUPA Inspector:Cesar ❑ No Environmental HELP, <br /> ❑ Regional Administrator Ruvalcaba] Inc. <br /> ❑x Technical Per CUPA APSA Inspector Report <br /> 04/21/2020 ❑ Non-Technical dated 07/30/2019 and Return to ❑x Yes Professional Engineer - <br /> ❑ 5-Yr Review Compliance report dated ❑ No Alejandro J.Alatorre PE <br /> ❑ Regional Administrator 03/31/2020 RCE#3276105-21-2020 <br /> ❑Technical <br /> ❑ Non-Technical ❑Yes <br /> ❑ 5-Yr Review ❑ No <br /> ❑ Regional Administrator <br /> ❑Technical <br /> ❑ Non-Technical ❑Yes <br /> ❑ 5-Yr Review ❑ No <br /> ❑ Regional Administrator <br /> ❑Technical <br /> ❑ Non-Technical ❑Yes <br /> ❑ 5-Yr Review ❑ No <br /> ❑ Regional Administrator <br /> Describe the specific amendment made. If no amendment is needed,enter the following text: "I have reviewed this SPCC Plan and will not amend the Plan." <br /> 2 Technical amendments and amendments by the Regional Administrator require re-certification by a registered Professional Engineer. <br /> 3 SPCC Plans should only be amended by the following: The Facility Manager or Designated Person Accountable for Discharge Prevention(non-technical amendments)or a registered Professional <br /> Engineer(all other amendments). <br />