Laserfiche WebLink
CANCUN RESTAURANT Page 1 of 1 <br /> Path to Closure PlanGO OTRf2F A cel R�HOME I MANAGE PROJECTS I REPORTS IWARBI129M <br /> CANCUN RESTAURANT(70607716674)-MAP THIS SITE OPEN.SITE ASSESSMENT <br /> 135 MINER AGTIVITIEB REPORT CLEANUP R HTA I < <br /> STOCKTON CA 95202 SANJOAOUIN MUM LOP(LEAD)-CASES 0001994 <br /> SAN KTOUINCOUNTY PUBLIC WEEPAGE CASEWORKER:^NG ICASANOOVALMARIN-SUPERVISOR:ADRIENNEELLSAESSER <br /> CENTRAL VALLEY RWOCB(REGION SS)-CASE A'391173 <br /> \JPR ^ABLE CAE SUMM FOR THSSIMCASEWORKER!^M..FS BARYON-SUPERNSOR:CORI CONDON <br /> CUF CMI.6:1919E OUP Prlomy Assigned:B CUP Amount Paid:5111 SM <br /> THIS PROJECT WAS LAST MODIFIED BY NUEL HENDERSON ON 51112014 9:51:43 AM-HISTORY <br /> THIS SITE HAS SUBMITTALS.CUCKk=TO OPEN A NEW WINDOW WITH THE SUBMITTAL APPROVAL PAGE FOR THIS SITE. <br /> Path to Closure Plan THIS VERS/ONIS FINAL AS OFSPI=14 PATH To CLOSURE HISTORY ocL lx <br /> IMPEDIMENT is <br /> General Criteria F:Secondary source has NOT been removed to the extent practicable ❑ Precedurel Impediment-,== <br /> S[e fo Resolve Im imem 1-Sle 1:- COMPLETION DATE <br /> Implement the approved In-Situ chemical Oxidation (ISCO)Pilot Test Work Plan and submit report of PROJECTED AC <br /> TUALDAM <br /> findings and recommendations. &302014 <br /> ]131eoATF..=14C1L_n' -mw/'• ^H,1 vmit{oa_mmct_ iA_.._. _. -- <br /> ADDMADDITIONAL STEP <br /> IMPEDIMENT 2: <br /> Medi <br /> Specific Crlteri 'Petrole m Vaoo Intrusion to Indoor Air:The site is NOT considered low-threat for ❑ Procedural Impediment-JMpq <br /> the vapor-intrusion-lo-air pathway and site-specific conditions do NOT satisfy items 2a,2b,or 2c. <br /> Conditions that do not meet the policy criteria: <br /> • TPH In the Bloattenuatlon Zone:2100 mg/kg <br /> • Bioattenuation Zone Thickness:<5 Feet(No BIOZOne) <br /> • 02 Data in Bioattenuation Zone:No Oz Data <br /> • Benzene In Groundwater:2100 pg/l and<1,000 pg/I <br /> • Soil Gas Benzene:Unknown <br /> • Soil Gas EthylBenzene:Unknown <br /> • Soil Gas Naphthalene:Unknown <br /> Ste to Resolve lm dlment 2-Sle 1:- COMPLETION DATE - <br /> Resolution will be based on ISCO implementation and resultant analytical result.. <br /> Implement ISCO Pilot Test Work Plan and submit report of fining. PROJECTED14ATE AC DA <br /> &342014 <br /> Mau21114IIPnATF._-ic,`.n nV'.n! 1nsL euv„cG =-='•I^^ -^ -"� • •`^'�I nn. _, ___ <br /> Sa to Resolve lm Iment2-Ste 2:- COMPLETION DATE <br /> Implement appropriate remediation of impact soil and or groundwater to reduce benzene ..=an ratio., C M �ACTUAL p�TE '7 <br /> Y302015 4— <br /> Ste to Resolve Im ImeM 2 Sa 3:- P COMPLETION DATE <br /> Perform and report vapor t usion evaluation, collect data if necessary OJ GATE <br /> 11312014 <br /> AMAODITIONAL STEP <br /> REQUIREMENTS ALONG PATH TO CLOSURE <br /> PUBLIC WELL <br /> DATEIDENTIFIED RP NOTIFICATION PARTCIPl T10N DESTRUCTION WASTEAA DrQSAL ND SITECLOSURE <br /> FCCL REI TED. ..___ _. M_.... NDA DCTON _._. D. __ ATE. <br /> •db ItlantMed for Closure is tlIa dab all Impadllrenb ro cbwn Mw lean nmovad <br /> Sava Form as Partially Completed Save Form as Complete <br /> CONTACT GEOTR YFR HELP <br /> LOGGED IN AS HENDERSONN <br /> https:Hgeotracker.waterboards.ca.gov/regulators/screens/closure_policy.asp?global_id=TO... 5/12/2014 <br />