Laserfiche WebLink
' ENSR AECOM <br /> 6.0 References <br /> ENSR International, 2004, Quarterly Groundwater Monitoring and Ozone Pilot Test Status Report, Fourth <br /> ' Quarter 2003, Former Unocal Facility#0187, February. <br /> ENSR International, 2005, Quarterly Groundwater Monitoring and Ozone Pilot Test Status Report,Third <br /> Quarter 2005, Former Unocal Facility#0187, October 26. <br /> Gettler- Ryan, Inc., 2003a, Ozone Microsparging System Pilot Test Status Report, April. <br /> ' Gettler- Ryan, Inc., 2003b, Second Quarter Event of May 27, 28, 29. and 30, 2003. Groundwater Monitoring <br /> &Sampling Report. <br /> ' Gettler-Ryan, Inc., 2003c, Groundwater Monitoring and Sampling Report Third Quarter-Event of August 26, <br /> 27, 28&29, September. <br /> Getter- Ryan, Inc., 2003d, Draft Ozone Microsparge Remedial System Status Report, October. <br /> ' Gettler-Ryan, Inc., 2003e, Ozone Microsparge System Pilot Test Status Report, November. <br /> Gettler-Ryan, Inc., 2001,Transmittal for Interim Remedial Test Report, August. <br /> Gettler-Ryan, Inc., 2000a, Monitoring Well Installation Report. Report Number 240042.05-1. <br /> Gettler-Ryan, Inc., 2000b, Monitoring Well Installation Report, Vapor Extraction Pilot Test Report, and Interim <br /> Remedial Action Plan. Report 240042.08-01, December. <br /> GeoStrategies, Inc., 1997, Well Installation Report, Report Number 4827.21-2, October. <br /> GeoStrategies, Inc., 1995a, Limited Phase I Environmental Site Assessment, May. <br /> GeoStrategies, Inc., 1995b, Well Installed and Soil Boring Report. Report 4827.04-03, October. <br /> GeoStrategies, Inc., 1994, Well Installation and Exploratory Soil Boring Report, September. <br /> GeoStrategies, Inc., 1993, Exploratory Soil Boring Report, December. <br /> ' GeoStrategies, Inc., 1992,Tank removal Observation Report, September. <br /> Pacific Environmental Group, Inc., 1998, Petition for Review of Local Oversight Program Action, January. <br /> ' PHR Environmental Consultants, Inc., 1992, Phase I Environmental Site Assessment Report, April. <br /> 1 <br /> jARem_Eng\Project Files1P60(6000- 6-1 ,January 2006 <br /> ' 6999)16940-UNOCAL Portfolio Closure%940- <br /> UNOCAL Portfolio ciosurelsite 0187-Stockton <br /> East Minor\CSM Report\CSM Report Final.doc <br /> i <br />