Laserfiche WebLink
• Work Plan -Fonncr Unocal Station No 0187 <br /> October 9, 1997 <br /> SCOPE OF PROPOSED WORK <br /> TASK 1 WELL INSTALLATION <br /> To further assess the lateral extent of dissolved hydrocarbons in groundwater northeast of the subject site, <br /> GSI proposes to install one additional offsite groundwater monitoring well approximately 120 feet <br /> northeast of well U-9 As shown on Figure 3, the proposed location of this well is restricted due to the <br /> proximity of the surrounding buildings. GSI Field Methods and Procedures are presented in Appendix A <br /> To perform this work, GSI will perform the following specific tasks <br /> Task 1 1 Pre-Field Activities <br /> GSI will update the site safety plan Underground Service Alert (USA) will be notified a minimum <br /> of 48 hours prior to initiating well installation activities Unocal will secure an access agreement from <br /> the property owner <br /> Task 12 Field Activities <br /> GSI will install one groundwater monitoring well at the location shown on Figure 3 Drilling and <br /> well installation will be performed by a California licensed well driller The well boring will be <br /> drilled with eight-inch-diameter hollow-stem augers to a total depth of approximately 55 feet bgs <br /> We estimate groundwater will be encountered at approximately 32 feet bgs As previously discussed, <br /> the lowest depth to groundwater was recorded at approximately 48 feet bgs in August 1994 <br /> Groundwater has continued to rise from August 1994 to August 1997, a rise of approximately 16 feet <br /> in three years To accommodate the historical low and high groundwater depths for this site, we <br /> intend to construct the proposed well with approximately 23 feet of screen within the saturated zone <br /> and 7 feet of screen extending above the saturated zone San Joaquin County Public Health Sec <br /> Environmental Health Division (SJCPHS) has indicated in the past that the maximum screen interval rnes, <br /> for a groundwater monitoring well is 20 feet This screen interval will not cover the historical low <br /> and high depths to groundwater The proposed well construction is shown on Figure 4 <br /> A GSI geologist will monitor the drilling activities and prepare a log of the boring Soil samples for <br /> description and possible chemical analysis will be obtained from the well boring at five-foot intervals, <br /> as a minimum Soil from each sampled interval will be screened in the field for the presence of <br /> volatile organic compounds using a photoionization detector (PID) Although the actual number of <br /> samples submitted for chemical analysis will depend on site conditions and field screening data, we <br /> anticipate a minimum of two unsaturated samples from the boring will be submitted for chemical <br /> analysis as described in Task 1 5 <br /> Drill cuttings will be stored at the site pending receipt of chemical analytical data and disposal The <br /> drill cuttings will be stockpiled on and covered with plastic sheeting Soil samples will be collected <br /> from the drill cuttings as described in Appendix A These samples will be submitted to the laboratory <br /> for compositing into one sample, and then analyzed as described in Task 1 5 Steam cleaning rinsate <br /> waste water will be stored at the site in properly labelled drums pending disposal <br /> • <br /> 4M07 1 3 <br />