My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012148
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MINER
>
437
>
3500 - Local Oversight Program
>
PR0541875
>
ARCHIVED REPORTS_XR0012148
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2020 5:49:49 PM
Creation date
3/16/2020 3:10:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012148
RECORD_ID
PR0541875
PE
2960
FACILITY_ID
FA0024017
FACILITY_NAME
CHEVRON SITE 306415
STREET_NUMBER
437
Direction
E
STREET_NAME
MINER
STREET_TYPE
AVE
City
STOCKTON
Zip
95202
APN
1392417
CURRENT_STATUS
01
SITE_LOCATION
437 E MINER AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. Work Plan - Former Unocal station No 0187 <br /> October 9, I997 <br /> Based on the soil and groundwater data, the most appropriate course of action for this site is to implement <br /> a feasibility study which includes monitoring and sampling the current and proposed groundwater <br /> Monitoring wells on a quarterly basis for a minimum period of one year The quarterly monitoring data <br /> will be used to evaluate natural attenuation and stability of the dissolved hydrocarbon plume This <br /> approach appears appropriate based on site conditions as indicated by SJCPHS statement in their June <br /> 25th, 1997 letter, " it is unlikely that the site poses an immediate significant human health risk " <br /> TAS QJJARTERLY MZ nT T NDWATER MONITORING <br /> MPDS will monitor and sample all groundwater monitoring wells on a quarterly basis The groundwater <br /> samples will be analyzed for TPHg/BTEX/MTBE As required, the quarterly reports will be submitted <br /> to SJCPHS within 30 days following the end of each quarter <br /> PROJECT STAFF <br /> Mr Stephen J Carter, a Registered Geologist in the State of California (R G No 5577), will provide <br /> technical oversight and review of the work Mr. Greg Gurss, Project Manager, will supervise field and <br /> office operations GSI employs a staff of geologists, engineers, and technicians who will assist with the <br /> project <br /> SCHEDULE <br /> Implementation of the proposed scope of work will commence upon receipt of regulatory approval and <br /> a signed access agreement from the property owner <br /> 4n7 07 1 <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.