Laserfiche WebLink
FS <br />' ORCHARD <br />' MfY-1 <br /> •Ps DIRT * 35 97' <br /> V <br /> ' 36 96' <br /> MILGEO AVENUE <br /> ' DIRT <br /> X X <br /> MW-3 <br /> • P4. Pb• P8 <br /> l 35 98' P 10 <br /> M4P 4 A/B <br /> 36 93' • 2 <br /> 8� 35 <br /> ' o <br /> 38 oG' <br /> r t <br /> P12A/B -g38 05 <br /> 6F05' a s <br /> z <br /> O <br /> / z <br /> *Pit <br /> mw— 3s os' <br /> �ND 3608' <br /> • SOIL BORING LOCATION <br /> 38 92 NONLTORRNG WEiL LOCATION SHOWING <br /> 38 92 RELATIVE GROUND WATER ELEVATION <br /> ® MaSTMG BUILDING N <br /> 0 0005 GROUND WATER FLOW DIRECTION AND GRADIENT <br /> SCALE <br /> DATES 8/98 TO CURRENT 0 50 100 <br /> ' 'ROSE DIAGRAM HIUSTRATING FREQUENCY <br /> Or GROUND WATER FIDT DIRECTIONS 0 7 FEB 2003 <br /> ORIENTED FROM FORIM UST EXCAVA17ON <br /> GROUND WATER ELEVATION 14dvar�ced <br /> SHOCKEY TRUCKING GeoEnvironm&fly inc. <br /> ar 1va�� c.ZrrQ. <br /> 850 MILGEO AVENUE PROJECT NO AGE--NC-95-0185 FILE SHICY0203 FIGURE <br /> ' RIPON, CALIFORNIA DATE 20 FEBRUARY 2003 DRAWN BY MAC 3 <br />