Laserfiche WebLink
24 March 1999 <br /> AGE-NC Project No. 95-0185 <br /> Page 4 of 4 <br />' 0 Plan and implement abatement of the free product encountered in MW-4. <br /> • Continued quarterly ground water monitoring; the next quarterly monitoring event should <br /> be scheduled for March 1999. <br />' G.O. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities. The findings were based on <br /> analytical results provided by an independent laboratory. Evaluations of the geologic/hydrogeologic <br /> conditions at the site for the purpose of this investigation are made from a limited number of <br /> available data points (i.e. monitoring well ground water samples) and subsurface conditions may <br /> vary away from these data points. No other warranty, expressed or implied, is made as to the <br /> professional recommendations contained in this report. <br /> Advanced GeoEnvironmental,Inc. <br />