Laserfiche WebLink
14 April 1998 <br /> • AGE-NC Project No. 95-0185 <br /> ' Page 4 of 4 <br /> 5.0. RECOMMENDATIONS <br /> Based upon data collected at the site, AGE recommends the following: <br /> ' AGE recommends collecting a minimum of four grab ground water samples to delineate the <br /> dissolved hydrocarbon plume and to determine the necessity for placement of additional <br /> ' ground water monitoring wells, if necessary. Upon the request of the PHS-EHD, AGE will <br /> provide a site specific work plan addendum for the collection of grab ground water samples. <br /> • Conduct a receptor survey to identify any city, domestic, irrigation or monitoring water wells <br /> located within a 2,000-foot radius. <br /> • Continued quarterly ground water monitoring; the next quarterly monitoring event should <br /> be scheduled for April or May 1998. <br /> 6.0. LIMITATIONS <br /> ,• Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities. The findings were based on <br /> analytical results provided by an independent laboratory.,Evaluations of the geologic/hydrogeologic <br /> ' conditions at the site for the purpose of this investigation are made from a limited number of <br /> available data points (i.e. monitoring well ground water samples) and subsurface conditions may <br /> vary away from these data points. No other warranty, expressed or implied, is made as to the. <br />.' professional recommendations contained in this report. <br /> 1 <br />' A&wnred GcoEnvironmental,Inc. <br />