My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005355
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MILGEO
>
850
>
3500 - Local Oversight Program
>
PR0545550
>
ARCHIVED REPORTS_XR0005355
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2020 8:42:37 PM
Creation date
3/16/2020 5:01:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005355
RECORD_ID
PR0545550
PE
3528
FACILITY_ID
FA0003973
FACILITY_NAME
SHOCKEY & SONS TRUCKING
STREET_NUMBER
850
STREET_NAME
MILGEO
STREET_TYPE
RD
City
RIPON
Zip
95366
CURRENT_STATUS
02
SITE_LOCATION
850 MILGEO RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t . 15 August 1996 <br /> AGE-NC Project No. 95-0185 <br /> Page 3 of 8 <br /> 3.1.3. GRAB GROUND WATER SAMPLE COLLECTION <br /> i <br /> Grab ground water samples were collected from probe borings P1 and P4 using a Geoprobe water <br /> jt sampling assembly, which was extended into ground water, then pulled back to expose a water <br /> sampler screen interval. Ground water was allowed to enter the sampler, and samples were retrieved <br /> using a modified tygon tubing bailer. <br /> a, <br /> After sample retrieval, the sampler was disassembled and cleaned. New PVC tubing was used for <br /> each sample. Samples were collected in 40-ml EPA vials containing hydrochloric acid as a <br /> preservative, and in 1-liter amber bottles. The samples were labeled, placed in a chilled container <br /> and transported under chain-of-custody to MAI for analysis. <br />`t <br /> 3.1.4. LABORATORY ANALYSIS <br /> Selected soil and ground water samples were analyzed for total petroleum hydrocarbons quantified <br /> as diesel (TPH-d) and volatile aromatics (benzene, toluene, ethyl benzene and xylenes: BTE&X). <br /> Soil samples were analyzed in accordance with EPA methods 5030/8015m and 8020; ground water <br /> samples were analyzed in accordance with EPA methods 5030/8015m and 602. <br /> ' 3.2. MONITORING WELL INSTALLATION <br /> 3.2.1. DRILLING AND SAMPLING <br /> On 06 and 07 June 1996,four soil borings were drilled at the site. Boring B1 (MW-1) was advanced <br /> ' on the northern side of the Highway 99 Frontage Road, in the City of Ripon Right-of-Way; boring <br /> B2 (MW-2) was advanced south of the former UST excavation; boring B3 (MW-3) was established <br /> west of the former UST excavation; and boring B4 (MW-4) was advanced on the southwest corner <br /> of the former UST excavation. <br /> ' All drilling was performed using a truck-mounted CME 75-HT drill rig equipped with continuous <br /> flight, hollow-stem augers. The drill rig and two-man crew were supplied by Soil Exploration <br /> Services (SES) of Benicia, California. The locations of the borings are shown on Figure 2. . <br /> Samples were collected in each boring using a split tube sampler loaded with three clean,2 by 6-inch <br /> brass sleeves. A 140-pound hammer was used to advance the sampler 18 inches; the number of <br /> blows required to advance the sampler in 6-inch increments was recorded on the boring logs. All <br /> sampling equipment was washed in an Alconox solution and rinsed twice with water prior to each <br /> sampling run. <br /> 41 <br /> s' <br /> J <br />
The URL can be used to link to this page
Your browser does not support the video tag.