My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012252
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MINER
>
545
>
3500 - Local Oversight Program
>
PR0545551
>
ARCHIVED REPORTS_XR0012252
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2020 11:16:52 PM
Creation date
3/17/2020 1:50:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012252
RECORD_ID
PR0545551
PE
3528
FACILITY_ID
FA0012578
FACILITY_NAME
CHETS AUTO
STREET_NUMBER
545
Direction
E
STREET_NAME
MINER
STREET_TYPE
AVE
City
STOCKTON
Zip
95220
CURRENT_STATUS
02
SITE_LOCATION
545 E MINER AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 1 <br />� 1 <br /> Historical Background <br /> ' AGE-NC ProjectNo 00-0764 <br /> Page 3 of 3 <br /> ' GROUND WATER MONITORING WELL INSTALLATION <br /> On 13 and 14 August 2002, five ground water monitoring wells were Installed near the UST area <br /> ' (MW-1 though MW-5)to quantify the hydrocarbon concentration in ground water and determine the <br /> direction of ground water flow Field work was performed as described in the AGE-prepared <br /> Monitoring Well Installation Work Plan, dated 08 July 2002, as amended and approved by the San <br /> ' Joaquin Country Environmental Health Department(EHD) by letter dated 18 July 2002 <br /> ' MW-1 through MW-5 were completed as ground water monitoring wells with slotted screens <br /> Installed from approximately 15 to 35 feet bsg in borings MW-1 through MW-4 and from <br /> approximately 69 to 74 feet bsg in boring MW-5 Locations of the monitoring wells are illustrated <br /> on Figure 2 of this report <br /> Results of the well installation and subsequent sampling delineated the dissolved hydrocarbons and <br /> indicated direction of ground water flow to be generally toward the northeast Ground water <br /> monitoring enabled delineation of the dissolved hydrocarbon plume The dissolved hydrocarbon <br /> plume has been vertically delineated Analytical data is presented in the attached tables <br /> lie <br /> STRATIGRAPHY AND DEPTH TO GROUND WATER <br /> Silt with a tanbrown or gray color (color apparently depending on hydrocarbon Impact) was <br /> generally encountered from a depth of approximately 5 feet to 35 feet bsg in the shallow well <br /> ' borings, the coarsest material was silty sand, collected at a depth of 25 feet bsg in boring MW-2 <br /> Silty sand was generally encountered to a depth approximately of 40 feet to 45 feet bsg Generally, <br /> poorly graded sand and silty sand was encountered between 60 and 75 feet bsg in boring MW-5 <br /> ' Ground water was encountered at a depth of 30 feet bsg during drilling <br /> r <br /> r <br /> r <br /> r <br /> • <br /> r <br /> Advanced GeoEnvlronmentai,Inc <br />� r <br />
The URL can be used to link to this page
Your browser does not support the video tag.