My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005016
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MOFFAT
>
983
>
2900 - Site Mitigation Program
>
PR0507952
>
ARCHIVED REPORTS_XR0005016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2020 1:55:57 AM
Creation date
3/17/2020 1:59:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005016
RECORD_ID
PR0507952
PE
2950
FACILITY_ID
FA0007846
FACILITY_NAME
OLYMPIAN CFN
STREET_NUMBER
983
STREET_NAME
MOFFAT
STREET_TYPE
BLVD
City
MANTECA
Zip
95336
APN
22115006
CURRENT_STATUS
01
SITE_LOCATION
983 MOFFAT BLVD
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ground Water Aquifer Pumping Test Report-Second Quarter 2001 <br /> Mel Bokides Petroleum - Manteca Station <br /> t983 Moffat Boulevard, Manteca, California <br /> 1.0. INTRODUCTION <br /> At the request of Mr.Nick Bokides of Mel Bokides Petroleum(MBP),Advanced GeoEnvironmental, <br /> Inc. (AGE) has prepared this ground water aquifer pumping test report conducted at 983 Moffat <br /> Boulevard, Manteca, California. The site setting is illustrated on Figure 1. Site structures and <br /> monitoring well locations are depicted on Figure 2. <br /> 1 "The objective of the work was to obtain general ground water aquifer characteristics and to evaluate <br /> aquifer response to ground water extraction at a constant pumping rate. This report is prepared in <br /> accordance with guidelines established by the California Regional Water Quality Control Board- <br /> Central Valley Division for investigation of underground storage tank (UST) sites. <br /> ' Background information is summarized in the AGE-prepared Preliminary Investigation and <br /> Evaluation Report December 1998,dated 09 March 1999 and Quarterly Report First Quarter 2000, <br /> dated 07 March 2000. Ground water extraction procedures for the site were outlined in Additional <br />. ' Site Assessment and Ground Water Extraction Pilot Test Work Plan, dated 31 May 2000, prepared <br /> by AGE and approved by the San Joaquin County Public Health Services - Environmental Health <br /> Division (PHS-EHD) by letter dated 16 June 2001. <br /> 2.0. GROUND WATER'AQUIFER PUMPING TEST <br /> On 23 May 2001, aground water aquifer pumping test was performed at the site to assess the general <br /> ground water aquifer characteristics and to assess aquifer response to ground water extraction <br /> ' utilizing wells EW-1, MW-1 through MW-6 at a constant pumping rate. Table 1 shows completion <br /> details for wells utilized for the pump test. Purged ground water was containerized in an on-site <br /> ' 6,500-gallon poly tank (Baker tank). <br /> A four-inch diameter Gnuldfos submersible pump was utilized to evacuate water from the pumping <br /> ' well. The pumping rate for the test was determined by measuring-the time required to fill a 5-gallon <br /> bucket from the pumping discharge hose. <br /> 2.1. AQUIFER PUMPING TEST <br /> ' The static pumping test consisted of extracting ground water from well EW-I at a rate of 5 gpm <br /> utilizing a 4-inch diameter submersible Grundfos Redi-flo pump. Approximately 3,600 gallons of <br /> water were removed from EW-1 during.the our constant rate drawdown test. <br /> Advanced CcoEnviromnental,Inc. <br /> q <br />
The URL can be used to link to this page
Your browser does not support the video tag.