My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
ARCHIVED REPORTS_XR0005008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2020 12:37:03 AM
Creation date
3/17/2020 2:49:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005008
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> ' Tri Regional Recommendation Page 24 of 24 <br /> Appendix A <br /> • T ABLE 1 - CHECKLIST OF REQUIRED DATA <br /> FOR NO FURTHER ACTION REQUESTS AT UNDERGROUND TANK SITES <br /> Site Name and Location <br /> 1 Distance to production wells for municipal, domestic, agriculture,industry and <br /> other uses within 2000 fear of the site, <br /> 2 Site maps, to scale, of area impacted showing locations of any former and existing tank systems, <br /> excavation contours and sample locations, bonng and monitoring wall elevation contours, <br /> gradients, and nearby surface waters, buiidings, streets, and subsurface utilities, <br /> ❑ 3 Figures depicting athology(cross section), treatment system diagrams, <br /> ❑ 4 Stockpiled soil remaining on-srte or off-site disposal(quantity), <br /> ❑ 5 Monitonng wells remaining on-site, fate, <br /> ❑ 6 Tabulated results of all groundwater elevations and depths to water, <br /> ❑ 7 Tabulated results of all sampling and analyses <br /> ❑Detection limits for confirmation sampling <br /> ' ❑Lead analyses <br /> 8 Concentration contours of contaminants found and those remaining in soil <br /> and groundwater, and both on-site and off-site <br /> ❑Lateral and ❑Vertical extent of soil contamination <br /> ❑Lateral and ❑Vertical extent of groundwater contamination <br /> 9 Zone of influence calculated and assumptions used for subsurface <br /> remediation system and the zone of capture attained for the soil and <br /> groundwater remediation system, <br /> ❑ 10 Reports/Information ❑ unauthorized Release Form ❑ QMRs(Dates) <br /> ❑ Welland bonng logs ❑ PAR ❑FRP ❑ Other(report name) <br /> ❑ 11 Best Available Technology(BA T)used or an explanation for not using BAT, <br /> ❑ 12 Reasons why background round wasrs unattainable usingBAT, <br /> ❑ 13 Mass balance calculation of substance treated versus that remaining, <br /> ' ❑ 14 Assumptions,parameters, calculations and model used in risk <br /> assessments, and fate and transport modeling, <br /> 15 Rationale why conditions remaining at site will not adversely <br /> impact water quality, health, or other beneficial uses, and <br /> ❑ 16 WET or 7CLP results <br /> By <br /> Comments <br /> Date <br /> N <br />
The URL can be used to link to this page
Your browser does not support the video tag.