Laserfiche WebLink
� � ■■� w ■■� w �■w �r w w �■w w w■ w w rw w rw �■w � <br /> �o <br /> MW ,m <br /> -B <br /> hh <br /> m <br /> VE �° <br /> LO <br /> m <br /> -6 71 <br /> O <br /> 0 VE— <br /> O <br /> CHP7 ft/ MW-1 1 <br /> • VE-6 f -690, <br /> O-1r 1 <br /> CHP6 <br /> 1Vu 1 <br /> USTS ` AS--1 USTa <br /> MW-7 <br /> -3* <br /> I <br /> MW, 4 <br /> -3 <br /> Bl l/WP8 O <br /> MW-3 CB5 _1 CB 17 <br /> -6 72' m -2 CB8 VW-7 <br /> C� B13/WP8 <br /> 0 8 <br /> CB4/ 4 'Y <br /> 'a EW-2 <br /> •CHP2 CB9 <br /> 9 <br /> B /WP1 <br /> 00 <br /> • B12/WP7 <br /> B10 <br /> • <br /> REMED ON EN URE CHP8 <br /> CHP5C <br /> MW-5 - <br /> -8 7CHPS <br /> 7 <br /> EW-1 <br /> • <br /> CHPI <br /> B7 <br /> O CB3 <br /> B10/WP5 CHP90 <br /> B9/WP4 . <br /> CHP3 <br /> B13/WP3 LEGEND <br /> ® BUILDING <br /> MW-1 MONITORING/EXTRACTION WELL LOCATION <br /> -813' GROUND WATER ELEVATION <br /> ASD--1 AIR SPARGING OBSERVATION WELL <br /> IAS-1 AIR SPARGING INJECTION WELL. <br /> VW-1 i7 VAPOR EXTRACTION WELL <br /> 0-2 VAPOR EXTRACTION & AIR SPARGING OBSERVATION WELL Y' - <br /> B8/WP3 SOIL BORING <br /> CB1 0 CONFORMATION SOIL BORING <br /> CHPI • CONFORMATION HYDRO PUNCH BORING <br /> CONFORMATION BORING TRACE <br /> LBOs. <br /> ESTIMATED GROUND WATER ELEVATION CONTOUR LINE <br /> 0 <br /> 00, f INFERRED GROUND WATER FLOW DIRECTION AND GRADIENT <br /> rt <br /> NOTES <br /> Ground water momtormg data collected on 10 AUGUST 2006 <br /> All units reported as feet below mean sea level <br /> N <br /> 0 <br /> SCAI0 80 GROUND WATER CONTOURS 14dvanced <br /> CHAPIN BROTHERS INVESTMENTS Ge°En�vr�onmental, Inc. <br /> 1766 MONTE DIABLO AVENUE PROJECT NO 96-103 FILE 96-103 FIGURE <br /> STOCKTON, CALIFORNIA DATE 10 AUGUST 2006 DRAWN BY MAC 1 3 <br />