My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
ARCHIVED REPORTS_XR0005013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2020 2:27:36 AM
Creation date
3/17/2020 2:54:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005013
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
m m m <br /> MW-2 <br /> <50 <br /> Mw-6 DLO AVE �E <br /> MOx�E <br /> 5 <br /> CHP7 100 MW-1 CBI <br /> 1,40Q*C <br /> / CHPB l <br /> MW-7 <br /> 1 000 c50 <br /> B <br /> . Bll/WP6 �_00 �0 <br /> VW <br /> B13/WP8 <br /> w3 3,201D <br /> •CHP2 �p +CB9 <br /> Bs/wP1 R4 <br /> 000 <br /> B12/WP7 <br /> CD10 <br /> REVEDATION ENCLOSM • <br /> CHP8 <br /> CllpI <br /> —5 s <br /> ND <br /> \\ 3,300 <br /> B7 CHPI <br /> o CB3 <br /> B1G/wP5 CHP90 <br /> CHP3 B9/WP4 . <br /> • <br /> LEGEND <br /> ® BUILDING <br /> Ba/W3 <br /> MW-1 MONITORING/EXTRACTION WELL LOCATION <br /> 25 OCTOBER 2005 <br /> ASO-1 AIR SPARGING OBSERVATION WELL <br /> IAS-1 AIR SPARGING INJECTION WELL <br /> VW-1 VAPOR EXTRACTION WELL <br /> ASO-2 <br /> #EVAPOR EXTRACTION & AIR SPARGING OBSERVATION WELL <br /> B8/WP3 • SOIL BORING <br /> CBi O CONFORMATION SOIL BORING <br /> CHP1 • CONFORMATION HYDRO PUNCH BORING <br /> l CONFORMATION BORING TRACE <br /> <60 TPH GASOLINE CONCENTRATIONS UG/L <br /> c5o DATA COLLECTED DURING PREVIOUS EVENT <br /> <50—<50 DATA COLLECTED PURGE EVENTS 08/10 <br /> EMULATED DISSOLVED TPH-G AREA GREATER THAN 5,000 UG/L <br /> ESTIMATED DISSOLVED TPH-G AREA GREATER THAN 1,000 UG/L <br /> ESTIMATED DISSOLVED TPH-G AREA GREATER THAN 50 UG/L <br /> N <br /> CM <br /> 5330 BO DISSOLVED TPH- GASOLINE 14dvanced <br /> GeoEnvironmental, Inc. <br /> FEET CHAPIN BROTHERS INVESTMENTS ofIva-taolm •• <br /> 1766 MONTE DIABLO AVENUE PROJECT NO 95-108 j FILE 95-103 InGum <br /> STOCKTON, CALIFORNIA DATE 25 OCTOBER 2006 DRAWN BY MAC 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.