My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
ARCHIVED REPORTS_XR0005014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2020 1:25:32 AM
Creation date
3/17/2020 2:55:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005014
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1 <br /> . Site Background Information <br /> ' Chapin Brothers Investments, Inc <br /> Page 7 of 12 <br /> r7 to 10 scfm during each monitoring event A pressure of approximately 15 was to maintain for the <br /> air sparging flow rate <br /> rThe SVE unit operated at varying rates during the observation period Extraction now rates were <br /> calculated to range from 150 to 200 scfm Typically operation averaged at 150 scfm during the <br /> period Operation of the unit was attempted at 200 scfm, the maximum operational rate of the unit, <br /> ' however the unit was noted to overheat and automatically shut off apparently to prevent the catalyst <br /> beds from deteriorating <br /> rAn induced vacuum(negative pressure) of approximately 25 to 45 inches of water was measured in <br /> the piping between the blower and extraction wells The radius of influence at the well-heads was <br /> rnoted to range from 0 35 Inches of water at well MW-4 to 38 inches of water at ASO-3 <br /> Three sets of extracted soil gas samples were analyzed for TPH-g, BTEX and MTBE TPH-g was <br /> ' detected in the 09 April, 12 May and 18 June 1997 samples collected from influent vapor stream at <br /> concentrations of 1,800 micrograms per liter µg/l, 8,900 µg11 and 5,600 µg11, respectively BTEX <br /> compounds were detected at concentrations as high as 52 µg/1 Petroleum hydrocarbons were <br /> detected at 100 µg11 the sample collected from the effluent stream on 18 June 1997 <br /> rANALYTICAL RESULTS OF GROUND WATER SAMPLES - IAS/SVE STARTUP <br /> TPH-g was detected in the water samples from wells MW-1, MW-3, MW-4 and MW-5 at <br /> rconcentrations of 99,000 micrograms per liter µg11, 6,900 µg/l, 100,000 µg11 and 73 µg11, <br /> respectively Benzene was detected in wells MW-1, MW-3 and MW-4 at concentrations of 19,000 <br /> µg/1, 97 µg11 and 15,000 µg11, respectively Benzene was not detected in wells MW-2, MW-5 and <br /> rMW-6 Other BTEX compounds were detected in these wells at concentrations as high as 18,000 <br /> µg/1(toluene, MW-4) Ethylbenzene and xylenes were detected in MW-3 at concentrations of 230 <br /> µg/l for each compound No petroleum hydrocarbons were detected In the samples collected from <br /> rwells MW-2 and MW-6, the newly installed down-gradient well <br /> rMONITORING WELL INSTALLATION <br /> r On 01 April 1998, soil boring MW-7 was advanced on the property directly east of the site The <br /> boring location is illustrated on Figure 2 The soil boring was advanced to a depth of 25 feet bsg <br /> Boring MW-7 was completed as a ground water monitoring well The well was completed using 2- <br /> inch diameter schedule 40 PVC casing with 0 02-mch slotted screen from approximately 5 to 25 feet <br /> bsg A filter pack was installed using#2 Lonestar sand from 4 to 25 feet Bentonite chips were used <br /> to make a two-foot plug and the remaining annular space was backfilled to the surface with portland <br /> r <br /> Advanced GeoEnvirontnental,Inc <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.