My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
ARCHIVED REPORTS_XR0005014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2020 1:25:32 AM
Creation date
3/17/2020 2:55:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005014
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Background Information <br /> Chapin Brothers Investments, Inc <br /> Page 12 of 12 <br /> effective remedial system was required <br /> In accordance with EHDICVRWQCB directives and approval,AGE conducted three separate ground <br /> water extraction pumping tests in March 2001 Analysis of the groundwater extraction data indicted <br /> that ex-situ ground water treatment was feasible,the radius of influence generated by a pumping rate <br /> of three gallons per minute is interpreted to be adequate to control further off-site migration of <br /> ' contaminants toward the west <br /> Under EHD directives and approval, a ground water pump-and-treat system began continuous <br /> ' operation at the site on 02 April 2002 <br /> ' TPH-g and BTEX concentrations have decreased in the monitoring well samples over the <br /> remediation period The overall reduction of benzene on- and off-site indicates successful removal <br /> ' of dissolved hydrocarbons and capture of off-site dissolved hydrocarbons,based on monitoring <br /> trend analysis <br /> The remediation-goals presented to the EHD by letter dated 10 August 2001 proposed that removal <br /> of 80 percent of the mass of dissolved hydrocarbons,or diminished remediation effectiveness,would <br /> be acceptable cleanup goals for the site Presently,at most impacted groundwater monitoring wells, <br /> ' the contaminant concentrations have been reduced to approximately I% benzene and 10% TPH-g <br /> of the pre-remediation levels <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> Advanced GeoEnvironmental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.