My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005155
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
ARCHIVED REPORTS_XR0005155
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2020 1:04:37 AM
Creation date
3/17/2020 3:04:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005155
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6-01-190S 9 28AH FROt1 ACE NC 2219 9SS C21700 P S <br /> • <br /> 31 May 1995 <br /> SGL-NC Piopo�,aJ No 10401 <br /> Pave. 4 of 7 <br /> 1 The cost foe sail sampling will be $ 12600 00 foi each sampbria e%ent <br /> We 'lllticipatc at least One Saillphi1u c;\,elft (3 moljtli pjoject dui ation) by no moie than three <br /> Sampling e\ent� (24 e� ontb pialect duration) <br /> 27 RE-FORT ING <br /> I'io-lrss lepoiting cit the VE/IAS system will be included lu Quaiteily Rifpoits submitted <br /> foul times each yeai The, cost foi iepoilmu is included in the quaiteily momtoiliig costs, <br /> olithiled 111 a difleiellt I,101)OS'd <br /> 28 OTHER 1TENIS <br /> Other ileitis not included in this proposal aic as follows, <br /> s Pence lelittil'f?u1C.mse The approximate cost foi <i st,mdaid chain-link fence <br /> • lc(lulILd to huu e the S A V E system 4iill lie <br /> > <br /> Ski pl) .nwiital fuel Natilial 0c1; 1s WIllable on-silo and \dill be LeSCd is i fUC-1 <br /> supplement, if needed toi the S A V E unit Costs for supplemental fuel will be <br /> billed dltectly to CllAPIN BROS , INC Costs fol supplemental fuel, bascd upon <br /> .l 21-inouth plolect clulatioli typically average to be $100 to $200 pc.i month <br /> Hos\e\ei, the cost will vaiy depeilding upon the %endor loi the Iiatuicil gas (i e , P G <br /> 4C lu , C1tV Of StOCIttOil, etc, ) <br /> } Ilistallatloll of natulcal ids 111rtel If a dedicated mitui it gas metes is desiii:d at the <br /> sit(f (14e iecommend it), CHAPIN BROS , INC will be billed diiectlr loi any <br /> insiallatlon char-es <br /> 3.0. C 0 ST <br /> The costs tol 111st'elltet1011 and opelation of the piciposed \,E/IAS system is as follows <br /> k 3 MONTHS OPERAHON PERIOD $ 18,99000 <br /> r 6 MONTHS QPEFLkTION PERIOD' $ 29,8-4000 <br /> r 17 NION'111S 011ER V110N P-CI ,IOD $ 466740 00 <br /> 21 MON I IIS OPERATION PERIOD: $ 71,98000 <br /> 1 <br /> T11CSe COStS 116 b u}soil estinlates 1>i,)rlde<1 111 this p1oposal and do not include vat table <br /> costs oiltlined in TASKS 2 4 of 2 8 All costs will be billed to the Client on a time and <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.