My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005157
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
ARCHIVED REPORTS_XR0005157
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2020 11:38:11 PM
Creation date
3/17/2020 3:04:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005157
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' SUMMARY OF ESTIMATED COSTS <br /> ` SUBSURFACE ENVIRONMENTAL INVESTIGATION <br /> CHAPIN BROS. INC. FACILITY <br /> STOCKTON, CALIFORNIA <br /> PAGE 2 OF 4 <br /> TASK 3 - MONITORING <br /> Startup <br /> Staff Geologist 16 hrs @ $65 $1,04000 <br /> Technician 16 hrs @ $55 $88000 <br /> Sample Analyses 6 @ $50 $400 00 <br /> Travel and Supplies <br /> $2,620.00 <br /> Weekly Monitoring (per month) <br /> Technician 16 hrs @ $55 $88000 <br /> Travel and Supplies $60000 <br /> Monthly Cost $1,480.00 <br /> Yearly Cost $17,760.00 <br /> Monthly Samples <br /> Technician 2 hrs @ $55 $11000 <br /> Sample Analyses 2 @ $50 $10000 <br /> Monthb Cost $210.00 <br /> Yearly Cost $2,520.00 <br /> TOTAL MONITORING COSTS, ONE YEAR 522,900.00 <br /> TASK 4 - Progress Sampling- 4 Borings,Two sample analyses per boring <br /> (Not Recommended) <br /> Staff Geologist 6 hrs @ $65 $390 00 <br /> Driller $1 000 QO <br /> Field Equipment <br /> Field Vehicle 1 day @ $40/day $40 00 <br /> Organic Vapor Meter 1 day @ $100/day $10000 <br /> Brass sleeves 16 @ $7/ea S11200 <br /> Laboratory Analyses <br /> Soil Samples 3 @ $50 $400.00 <br /> Cost Per Event $2,042.00 <br /> Cost Per Year(2 Events) S4,08400 <br /> TASK 5 - OPERATE AND MAINTAIN SYSTEM (YEARLY COSTS) <br /> Technician 150 hrs a) $55 $8,25000 <br /> Travel and Supplies S1,44000 <br /> Total Cost for One Year $9,690.00 <br /> ESTIMATED FUEL, UTILITY COSTS ($1,000 per Month) $12,000.00 <br /> TASK 6 - VERIFICATION SAMPLING AT COMPLE'X'ION <br /> Staff Geologist 12 hrs @ $65 S78000 <br /> Field Vehicle 1 day @ $40 $4000 <br /> Organic Vapor Meter 1 day t $100 $10000 <br /> Brass sleeves 36 @ $7 $25200 <br /> Sample Analyses 24 @ $50 $1,20000 <br /> Penetration Costs Estimate Includes travel, <br /> time, and 10-12 penetrations1�0 <br /> $4,172.00 <br /> Lusii GEOSGIFNCEC <br />
The URL can be used to link to this page
Your browser does not support the video tag.