My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005159
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
ARCHIVED REPORTS_XR0005159
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2020 1:10:53 AM
Creation date
3/17/2020 3:06:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005159
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. ENVIRONMENTAL HEALTH DIVISION <br /> 304 E Weber Ave Third Floor <br /> P O Box 388, S o kion CA 95201-0388 <br /> Approved <br /> Denied /�� <br /> 04 Ma y 1999 Conditions ;&&,4,;&&,4, ..,.. <br /> AGE-NC Project No 95-0103 Date <br /> Mr Harlin Knoll <br /> SAN JOAQUIN COUNTY <br /> Public Health Services - Environmental Health Division (PHS-EHD) <br /> 304 E Webber Avenue, 3'Floor <br /> Stockton, CA 95201 <br /> Subject. Work Plan For Off-Site Assessment <br /> CHAPIN BROTHERS,INC. <br /> 1766 Monte Diablo Avenue, Stockton, California <br /> Dear Mr Knoll <br /> At the request of Mr Russell Chapin,Advanced GeoEnvironmental, Inc (AGE)has prepared the <br /> enclosed Work Plan for Off-Site Assessment 1766 Monte Diablo Avenue, Stockton, California(the <br /> site) The scope of work includes the installation three soil borings on site, one soil boring off-site <br /> and the collection of seven grab waters through `hydro-punches' borings The location of the site and <br /> its surroundings are illustrated in Figure 1 Structures,well locations and proposed boring locations <br /> are illustrated in Figure 2 <br /> 10. BACKGROUND <br /> Site history and findings from previous investigations and monitoring events at the site are detailed <br /> in the Corrective Action Plan (CAP) and the Quarterly Reports prepared by AGE This scope of <br /> work was directed by the PHS-EHD in a letter to Mr Russell Chapin, dated 13 April 1999 <br /> Investigation activities will be performed in accordance with guidelines for investigation of <br /> underground storage tank(UST)sites established by the San Joaquin County Public Health Services <br /> - Environmental Health Division(PHS-EHD) and Central Valley Regional Water Quality Control <br /> Board (CVRWQCB) <br /> 2.0. SCOPE OF WORK <br /> A soil vapor extractionlair-sparging system has been installed and operated at the site to remediate <br />
The URL can be used to link to this page
Your browser does not support the video tag.