My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005161
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
ARCHIVED REPORTS_XR0005161
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2020 11:57:39 PM
Creation date
3/17/2020 3:06:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005161
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> 1 r <br /> 1 23 November 1998 <br /> AGE-NC Project No 95-0103 <br /> Page 5 of 7 <br /> ' detected an any of the soil-vapor samples above the method detection limit <br /> The analytical results of soil-vapor samples are summarized on Table 5 The laboratory report(MAI <br /> ' Lab ID No 92520 and 92521, 94426 and 96249), Quality Assurance and Quality Control (QA/QC) <br /> reports and chain-of-custody forms are included an Appendix C <br /> ' 3 6 MASS OF RECOVERED HYDROCARBONS <br /> ' The hydrocarbon mass removed during the operating period was calculated using the following <br /> equation M= C-Q•t <br /> ' where M=cumulative mass recovered (kg) <br /> C = soil-vapor concentration(kg/m3) <br /> ' Q =extraction flow rate (ml/hr) <br /> t=operational period, in hours <br /> The operational time over the last quarter was estimated to be 100 days The mass of hydrocarbons <br /> po removed was based on laboratory analyses of soil-vapor sample collected and analyzed The mass <br /> of extracted hydrocarbons was calculated for the period using the hydrocarbon concentrations <br /> ' determined from the influent vapor samples collected and the average air flow rate <br /> An estimated.total of 13 48 gallons of hydrocarbons quantified as gasoline were removed from the <br /> tsite The mass calculations are attached in Appendix D <br /> ' 4.0. DISCUSSION/CONCLUSIONS <br /> ' Based upon data collected from the site and the ongoing monitoring during site remediation, AGE <br /> concludes <br /> ' - The relative ground water elevations at the site decreased 15 feet over the last quarter The <br /> map of groundwater contours indicates a depression an the area of the active SVE network <br /> and well MW-1 <br /> ' - Monitoring wells MW-1,MW-2,MW-3,MW4 and MW-5 had ground water approximately <br /> four feet above the top of the screened interval,potentially reducing the effectiveness of the <br /> ' ground water monitoring wells to characterize the dissolved-phase hydrocarbon plume <br /> The greatest concentrations of petroleum hydrocarbons were detected in samples collected <br /> from well MW4 east of the former gasoline USTs location Hydrocarbons were detected at <br /> Advanced GeoEnvironmentsi,inc <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.