My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005162
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
ARCHIVED REPORTS_XR0005162
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2020 1:15:02 AM
Creation date
3/17/2020 3:07:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005162
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> 17 August 1998 <br /> AGE-NC Project No 95-0103 <br /> ' Page 5 of 7 <br /> induced vacuum(negative pressure)of approximately 30 Inches of water was measured in the piping <br /> between the blower and extraction wells The radius of a measurable vacuum at the outlying <br /> wellheads was noted to extend 90 feet from VW-1 to MW-3, with a transmitted vacuum force <br /> (potential) of 0 16 inches of water <br /> TPH-g was detected in the 04 June 1998 sample collected from the influent vapor stream at a <br /> concentration of 52 parts per billion (ppb, reported as micrograms per liter) BTE&X were not <br /> detected The analytical results of soil vapor samples are summarized on Table 5 The laboratory <br /> report(MAI Lab No 90055), Quality Assurance and Quality Control (QA/QC)reports and chain- <br /> of-custody forms are Included in Appendix C <br /> t3 b MASS OF RECOVERED HYDROCARBONS <br /> The hydrocarbon mass removed during the operating period was calculated using the following <br /> equation M= C•Q•t <br /> where M =cumulative mass recovered (kg) <br /> C =vapor concentration (kg/m}) <br /> Q= extraction flow rate (m3/hr) <br /> t=operational period, in hours <br /> The operational time over the last quarter was estimated to be 34 5 days The mass of hydrocarbons <br /> ' removed was based on laboratory analysis of one soil gas sample collected and analyzed The mass <br /> of extracted hydrocarbons was calculated for the period using the hydrocarbon concentrations <br /> ' determined from the influent vapor samples collected and the average air flow rate <br /> An estimated total of 13 gallons of hydrocarbons quantified as gasoline were removed from the site <br /> ' The mass calculations are attached in Appendix D <br /> ' 4.0. DISCUSSION/CONCLUSIONS <br /> Based upon data collected from the site and the ongoing monitoring during site remediation, AGE <br /> ' concludes the following <br /> • The relative ground water elevations at the site have remained similar to the previous quarter <br /> ' The profile of the ground water contours have indicated a depression in the area of the active <br /> SVE network, near the area of highest detected dissolved hydrocarbons <br /> Advanced GeoEn%ironmental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.