Laserfiche WebLink
•` �15 January 2001 <br /> AGE-NC Project No 95-0103 r <br /> Page 2 of 2 <br /> • During the pump tests, a Grundfos Rediflow4 down-well pump will be used in the ground <br /> water/soil vapor extraction well A Grundfos Rediflow2 down-well pump will be used to <br /> extract water from the ground water monitoring well with its 2-inch casing <br /> If you have any questions or comments, please contact our office at (209) 467-1006 <br /> Sincerely, <br /> Advanced GeoEnvironmental,Inc <br /> William Little ' <br /> Staff Geologist ; <br /> cc Mr Russell Chapin <br /> , <br /> r <br /> t , „ <br /> a tl ti <br /> ' V <br /> ,rt <br /> o Advanced GeoFnwronmental Inc <br />