My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005169
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
ARCHIVED REPORTS_XR0005169
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2020 12:04:53 AM
Creation date
3/17/2020 3:10:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005169
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 f ' <br /> i <br /> Quarterly Report - Third Quarter 2000 <br /> CHAPIN BROTHERS, INC. <br /> 1766 Monte Diablo Avenue, Stockton, California i <br /> 1:0. INTRODUCTION <br /> At the request of Mr Russell Chapin,Advanced GeoEnvironmental, Inc (AGE) has prepared this <br /> Quarterly Report of field activities conducted during the third quarter of 2000 at 1766 Monte Diablo . <br /> ' Avenue,Stockton,California The site setting is illustrated in Figure l Structures and well locations <br /> on or near the site are illustrated in Figure 2 Quarterly ground water monitoring activities were <br /> conducted on 31 July 2000 <br /> 1 , <br /> Background information and a description of prior investigations at the site are included in the <br /> ' Problem Assessment Report (PAR) prepared by Science & Engineering Analysis Corporation <br /> (SEACOR)dated 22 July 1994 and Quarterly Report-June and July 1999 dated 08 September 1999 <br /> Quarterly monitoring data from January 1994 to,the present is summarized in Tables 1 and 2 in this <br /> report <br /> 2.0. PROCEDURES <br /> Groundwater monitoring activities were performed in accordance with guidelines established by the <br /> San Joaquin County Public Health Services-Environmental Health Division(PHS-EHD)and Central <br /> Valley Regional Water Quality Control Board(CVRWQCB)and were performed in accordance with <br /> the approved Work Plan Addendums variously dated 07 April 1997, 10 May 1999 and 05 July 1999 <br /> 1 , <br /> n, <br /> ' 21 MONITORING WELL PURGE PROCEDURES <br /> On 31 July 2000, a Solmst water level meter was used to measure the depth to groundwater in <br /> monitoring wells MW-1 through MW-6,and vapor wells VE-1 and VE-6,relative to the tops of the <br /> ' well casings (Table 1) <br /> Z I <br /> ' After recording the depth to ground water measurements, monitoring wells MW-1 through MW-6 <br /> and vapor wells VE-1 and VE-6 were purged using a two-stage'purge pump A minimum of three <br /> well-volumes of water were removed from near the top of the water column in each well <br /> Temperature, pH and conductivity of purged ground water were measured at two to five-gallon <br /> intervals,as appropriate,using a Hydac water analyzer Dissolved oxygen concentrations in ground <br /> water were measured using a YSI-55 dissolved oxygen meter <br /> The purge pump was washed in an Alconox solution and rinsed with tap water prior to purging each <br /> well Purged water was stored in 55-gallon drums on the site Field measurements of purged ground <br /> ' water are included in Appendix A <br /> Advanced GeoEnvironmentat,Inc <br /> r , <br /> 1 ,i <br />
The URL can be used to link to this page
Your browser does not support the video tag.