My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005172
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
ARCHIVED REPORTS_XR0005172
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2020 12:17:36 AM
Creation date
3/17/2020 3:14:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005172
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 , <br /> Quarterly Report - October 1999 , <br /> L CHAPIN BROTHERS, INC. <br /> ' 1766 Monte Diablo Avenue, Stockton, California <br /> ' 1.0. INTRODUCTION <br /> 1 <br /> At the request of Mr Russell Chapin,Advanced GeoEnvironmental, Inc (AGE) has prepared this <br /> Quarterly Report of field activities conducted at 1766 Monte Diablo Avenue, Stockton, California <br /> a ' The site setting is illustrated in Figure 1 Structures and well locations on or near the site are <br /> ' illustrated in Figure 2 Quarterly ground water monitoring activities were conducted on 06 October <br /> 1999 <br /> i <br /> 4 <br /> ' Site history and findings from previous investigations and monitoring eNents at the site are <br /> summarized in Problem Assessment Report (PAR) prepared by Science & Engineering Analysis ` <br /> Corporation(SEACOR)dated 22 July 1994 and in the Quarterly Report- September 1995, prepared <br /> ' by AGE, dated 03 October 1995 <br /> ' 2.0. PROCEDURES <br /> 1 ' <br /> Ground water monitoring and soil sampling activities were performed in accordance with guidelines' <br /> '• established by the San Joaquin County Public Health Services - Environmental Health Division" <br /> (PHS-EHD,) and Central Valley Regional Water Quality Control Board (CVRW'QCB) and were, <br /> performed in accordance with the approved Work Plan Addendums, dated 07 April 1997, 10 May <br /> 1999 and 05 July 1999 <br /> 2 1 MONITORING WELL PURGE PROCEDURES <br /> On 06 October 1999, a Solinst water level meter was used to measure the depth to ground water in <br /> monitoring we]Is MW-1 through MW-6, and vapor wells VSE-I and VE-6,relative to the tops of the <br /> well casings, (Table 1) <br /> ' After recording the depth to ground water measurements, monitoring wells MW-1, MW-3 through <br /> ' <br /> MW-5 and vapor well VE-1 were purged using a two-stage purge pump A minimum of three well- <br /> volumes of water was removed from near the top of the water in each well Temperature, pH and <br /> conductivity of purged ground water were measured at one-,three- or seven-gallon intervals using <br /> an ICM model 52200 water analyzer Dissolved oxygen concentrations in ground water were <br /> ' measured using a YSI-55 dissolved oxygen meter <br /> 1 <br /> ' The purge pump was washed in an Alconox solution and rinsed with tap water prior to purging each <br /> well Purged water was stored in 55-gallon drums on the site Field measurements of purged ground° <br /> water,are included in Appendix B <br /> 1 <br /> Advanced CeoEnvironmental,Inc <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.